beam_furnishing_responsibility
NOTE: THESE BEAMS TO BE FURNISHED BY THE ELEVATOR CONTRACTORSection E-E note assigns furnishing of indicated beams to elevator contractor. Does not specify alloy, section sizes, installed count or fabrication/connection method.
Drawing notation: NOTE: THESE BEAMS TO BE FURNISHED BY THE ELEVATOR CONTRACTOR
Section E-E note assigns furnishing of indicated beams to elevator contractor. Does not specify alloy, section sizes, installed count or fabrication/connection method.