Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
material-pink-kasota-fleuri-polished-standingunreviewed · printed
Applications and finish
Main Post Office Lobby walls; Main Street entrance foyer walls; marble piers, wall stone, wainscot, stools and bases where scheduled · polishedprinted schedule transcribed in re-audit. Report transcription; physical thickness, joint layout and finish samples remain unresolved.
material-brown-nebo-golden-travis-floor-fieldunreviewed · printed
Applications and finish
Main Post Office Lobby floor field · high-honedprinted schedule transcribed in re-audit. Report transcription; physical thickness, joint layout and finish samples remain unresolved.
material-red-nebo-golden-travis-floor-borderunreviewed · printed
Applications and finish
Main Post Office Lobby floor border · high-honedprinted schedule transcribed in re-audit. Report transcription; physical thickness, joint layout and finish samples remain unresolved.
img1209-schedule-thresholdverified · printed
elevator_threshold_material_corroboration
ALL ELEVATOR THRESHOLDS CAST BRONZE (SEE DETAIL)Corroborates correction of closeout-img1209-threshold-lavatory_threshold_material. Crop courthouse-1210-threshold.jpg source x350,y50,w800,h650. Right/upper text cropped; original reading retained separately.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: ALL ELEVATOR THRESHOLDS CAST BRONZE (SEE DETAIL)
Corroborates correction of closeout-img1209-threshold-lavatory_threshold_material. Crop courthouse-1210-threshold.jpg source x350,y50,w800,h650. Right/upper text cropped; original reading retained separately.
img1209-schedule-marble-foyersverified · printed
floor_field_corroboration
(B) FIELD - BROWN NEBO GOLDEN TRAVISCompanion corroboration; source crop x350,y50,w800,h650, actualrotation0. Printed wording literal.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: (B) FIELD - BROWN NEBO GOLDEN TRAVIS
Companion corroboration; source crop x350,y50,w800,h650, actualrotation0. Printed wording literal.
w4-img1210-title-registerverified · printed
printed_sheet_number
W-4Inspected title crop x680,y1820,w650,h380 on 1650x2200 access image. Date remains literal; not assigned as issue/revision/installation date. Scale identifies drawing notation and does not authorize pixel-derived geometry.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: W-4
Inspected title crop x680,y1820,w650,h380 on 1650x2200 access image. Date remains literal; not assigned as issue/revision/installation date. Scale identifies drawing notation and does not authorize pixel-derived geometry.
w4-img1210-title-registerverified · printed
drawing_scale
1/8″ = 1′-0″0.125 in/ft
Inspected title crop x680,y1820,w650,h380 on 1650x2200 access image. Date remains literal; not assigned as issue/revision/installation date. Scale identifies drawing notation and does not authorize pixel-derived geometry.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: 1/8″ = 1′-0″
Inspected title crop x680,y1820,w650,h380 on 1650x2200 access image. Date remains literal; not assigned as issue/revision/installation date. Scale identifies drawing notation and does not authorize pixel-derived geometry.
w4-img1210-title-registerverified · printed
checked_date
CHECKED BY A.G.S. DATE 8-10-31Inspected title crop x680,y1820,w650,h380 on 1650x2200 access image. Date remains literal; not assigned as issue/revision/installation date. Scale identifies drawing notation and does not authorize pixel-derived geometry.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: CHECKED BY A.G.S. DATE 8-10-31
Inspected title crop x680,y1820,w650,h380 on 1650x2200 access image. Date remains literal; not assigned as issue/revision/installation date. Scale identifies drawing notation and does not authorize pixel-derived geometry.
img1210-schedule-marble-generalverified · printed
standing_marble_finish_exception
UNLESS OTHERWISE NOTED ALL STANDING MARBLE, WAINSCOTS, WINDOW STOOLS AND BASE TO BE POLISHED FINISHSame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: UNLESS OTHERWISE NOTED ALL STANDING MARBLE, WAINSCOTS, WINDOW STOOLS AND BASE TO BE POLISHED FINISH
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-foyersverified · printed
foyer_lobby_applicability
MAIN ST. ENTRANCE FOYER, BROADWAY FOYER, 6TH ST. FOYER AND MAIN POST OFFICE LOBBYSame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: MAIN ST. ENTRANCE FOYER, BROADWAY FOYER, 6TH ST. FOYER AND MAIN POST OFFICE LOBBY
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-foyersverified · printed
foyer_lobby_wall_material
WALLS - PINK KASOTA - FLEURISame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: WALLS - PINK KASOTA - FLEURI
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-stair-averified · printed
stair_a_material_applicability
FROM SIXTH ST. FOYER (BASEMENT LEVEL) TO 2ND FLOORSame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: FROM SIXTH ST. FOYER (BASEMENT LEVEL) TO 2ND FLOOR
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-stair-averified · printed
stair_a_wainscot_material
WAINSCOT - PINK KASOTA FLEURISame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: WAINSCOT - PINK KASOTA FLEURI
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-stair-cverified · printed
stair_c_material_applicability
FROM 1ST FLOOR TO 2ND FLOORSame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: FROM 1ST FLOOR TO 2ND FLOOR
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-stair-cverified · printed
stair_c_wainscot_material
WAINSCOT - PINK KASOTA FLEURISame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: WAINSCOT - PINK KASOTA FLEURI
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-sixth-lobbiesverified · printed
sixth_lobby_applicability
ELEVATOR AND COURT LOBBIES - 6TH FLOORSame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: ELEVATOR AND COURT LOBBIES - 6TH FLOOR
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-sixth-lobbiesverified · printed
sixth_lobby_wainscot_material
WAINSCOT - PINK KASOTA FLEURISame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: WAINSCOT - PINK KASOTA FLEURI
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-sixth-connectingverified · printed
sixth_connecting_corridor_applicability
6TH FLOOR CORRIDOR CONNECTING COURT LOBBIESSame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: 6TH FLOOR CORRIDOR CONNECTING COURT LOBBIES
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-sixth-connectingverified · printed
sixth_connecting_corridor_wainscot_material
WAINSCOT 4'-0" HIGH - PINK KASOTA FLEURISame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: WAINSCOT 4'-0" HIGH - PINK KASOTA FLEURI
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-sixth-connectingverified · printed
sixth_connecting_corridor_wainscot_height
4'-0" HIGH48 in
Printed scheduled wainscot height, separate from stone material. Does not establish actual top/bottom datum or installed extent.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: 4'-0" HIGH
Printed scheduled wainscot height, separate from stone material. Does not establish actual top/bottom datum or installed extent.