Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
stair-w228-fgh-floor-profile-registerunreviewed · observed
upper_profile_dimensions_unresolved
TYPICAL PROFILE / STAIR F & G AT 7TH FLOOR / STAIR H AT 1ST FLOOR [upper profile clipped]Numeric value unresolved
Assignment and handrail schedule duplicate verified prior properties and are reused only. This image does not recover complete profile dimensions; F/G profile applicability is7th floor and handrail wood schedule spans6th-to7th.
IMG_1123 · W-228 · Locate on drawing ↗Drawing notation: TYPICAL PROFILE / STAIR F & G AT 7TH FLOOR / STAIR H AT 1ST FLOOR [upper profile clipped]
Assignment and handrail schedule duplicate verified prior properties and are reused only. This image does not recover complete profile dimensions; F/G profile applicability is7th floor and handrail wood schedule spans6th-to7th.
stair-w228-fgh-floor-profile-registerverified · printed
newel_left_centerline_half_witness
2″2 in
F/G at7th and H at1st typical profile: source dimension from left newel boundary reference to newel centreline; not tubing wall thickness.
IMG_1122 · W-228 · Locate on drawing ↗Drawing notation: 2″
F/G at7th and H at1st typical profile: source dimension from left newel boundary reference to newel centreline; not tubing wall thickness.
stair-w228-fgh-floor-profile-registerverified · printed
newel_right_centerline_half_witness
2″2 in
Separate right half of same newel centreline chain. F/G/H profile applicability reused; no general B/D/E newel substitution.
stair-w228-fgh-floor-profile-registerverified · observed
finish_floor_and_profile_support_relationship
FIN. FLOOR [ornamental stepped profile passes floor edge with hatched structural support behind]Correct F/G/H typical profile now reached. Floor-surface reference, ornament and beam/support section distinguishable; complete profile thickness/material-code attribution unreviewed.
IMG_1122 · W-228 · Locate on drawing ↗Drawing notation: FIN. FLOOR [ornamental stepped profile passes floor edge with hatched structural support behind]
Correct F/G/H typical profile now reached. Floor-surface reference, ornament and beam/support section distinguishable; complete profile thickness/material-code attribution unreviewed.
stair-w228-fgh-floor-profile-registerunreviewed · printed
complete_profile_thicknesses_unresolved
[moulding offsets, facing thickness and support interface not numerically certified]Numeric value unresolved
Source now reviewed in correct region, but two2in half-witnesses do not recover complete cap/string/finish profile.
IMG_1122 · W-228 · Locate on drawing ↗Drawing notation: [moulding offsets, facing thickness and support interface not numerically certified]
Source now reviewed in correct region, but two2in half-witnesses do not recover complete cap/string/finish profile.