Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
section1013j-bb-roof-assemblyverified · printed
ventilator_material
COPPER VENTILATORPrinted leaders at trussed-roof tops on B-B, independent source scope from A-A ventilator note; no count, capacity or complete item geometry.
IMG_1235 · sheet-W105 · Locate on drawing ↗Drawing notation: COPPER VENTILATOR
Printed leaders at trussed-roof tops on B-B, independent source scope from A-A ventilator note; no count, capacity or complete item geometry.
section1013j-bb-roof-assemblyverified · printed
penthouse_cap_material
TERRA-COTTA CAPCap of small court-wall rooftop/penthouse representation in B-B, distinguished from long court-wall coping and low roof line.
section1013j-bb-roof-assemblyverified · printed
penthouse_wall_finish
CEM. PLASTERPrinted wall-finish leader on small rooftop/penthouse representation, no floor assigned from drawing alone. Earlier CEM.PL abbreviation on upper shaft remains separate.
IMG_1235 · sheet-W105 · Locate on drawing ↗Drawing notation: CEM. PLASTER
Printed wall-finish leader on small rooftop/penthouse representation, no floor assigned from drawing alone. Earlier CEM.PL abbreviation on upper shaft remains separate.
section1013j-bb-roof-assemblyverified · printed
court_wall_coping_material
TERRA-COTTA COPINGCoping over central projected court wall. Not a physical roof elevation or terrace finish.
section1013j-bb-roof-assemblyverified · observed
roof_high_to_ceiling_reference_endpoints
8′10″ / CEILING / ELEVATION195.42Outer vertical8′10″ witness joins labeled roof-high extension and labeled east courtroom CEILING extension. It is not a truss depth or a slab thickness. Existing ms-rise-bb-ceiling-roof-high is reused; ornament projects below labeled ceiling.
IMG_1235 · sheet-W105 · Locate on drawing ↗Drawing notation: 8′10″ / CEILING / ELEVATION195.42
Outer vertical8′10″ witness joins labeled roof-high extension and labeled east courtroom CEILING extension. It is not a truss depth or a slab thickness. Existing ms-rise-bb-ceiling-roof-high is reused; ornament projects below labeled ceiling.
Calculated from: ms-rise-bb-ceiling-roof-high, ms-east-courtroom-ceiling-elevation, ms-roof-high-point-printed