img1210-schedule-marble-sixth-connectingverified · printed
sixth_connecting_corridor_applicability
6TH FLOOR CORRIDOR CONNECTING COURT LOBBIESSame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: 6TH FLOOR CORRIDOR CONNECTING COURT LOBBIES
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-sixth-connectingverified · printed
sixth_connecting_corridor_wainscot_material
WAINSCOT 4'-0" HIGH - PINK KASOTA FLEURISame original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: WAINSCOT 4'-0" HIGH - PINK KASOTA FLEURI
Same original IMG1210 schedule clause only. Does not assign this material to unscheduled piers, stools or bases, establish physical geometry, or resolve the broader report-only material claim.
img1210-schedule-marble-sixth-connectingverified · printed
sixth_connecting_corridor_wainscot_height
4'-0" HIGH48 in
Printed scheduled wainscot height, separate from stone material. Does not establish actual top/bottom datum or installed extent.
IMG_1210 · W-4 · Locate on drawing ↗Drawing notation: 4'-0" HIGH
Printed scheduled wainscot height, separate from stone material. Does not establish actual top/bottom datum or installed extent.