Object: W217 Bay P Elevator No. 2 entrance
Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · printed
finished_entrance_width_between_inner_jamb_faces
3'-6"3.5 ft
Finished local entrance envelope only; not operating clear or rough opening. Authoring eligibility: eligible-local-finished-envelope. Report transcription; verify the cited drawing before promoting physical geometry.
IMG_1095 · sheet-W217 · View drawing ↗Drawing notation: 6" | 3'-6" | 6"
Existing text re-audit and existing verified elevator package; images not reopened. Bay P directory, paired door, Elevator No. 2 entrance, clock and other glazed door/screen bays
IMG_1097 · sheet-W217 · View drawing ↗Drawing notation: 6" | 3'-6" | 6"
Existing text re-audit and existing verified elevator package; images not reopened. Bay P directory, paired door, Elevator No. 2 entrance, clock and other glazed door/screen bays
IMG_1098 · sheet-W217 · View drawing ↗Drawing notation: 6" | 3'-6" | 6"
Existing text re-audit and existing verified elevator package; images not reopened. Bay P directory, paired door, Elevator No. 2 entrance, clock and other glazed door/screen bays
IMG_1305 · sheet-W217 · View drawing ↗Drawing notation: 6" | 3'-6" | 6"
Existing text re-audit and existing verified elevator package; images not reopened. Bay P directory, paired door, Elevator No. 2 entrance, clock and other glazed door/screen bays
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · printed
finished_entrance_height_floor_to_head
6'-9 3/4"6.8125 ft
Finished floor/sill to underside of head/indicator band; not operating clear or rough opening. Authoring eligibility: eligible-local-finished-envelope. Report transcription; verify the cited drawing before promoting physical geometry.
IMG_1095 · sheet-W217 · View drawing ↗Drawing notation: 6'-9 3/4"
Existing text re-audit and existing verified elevator package; images not reopened. Bay P directory, paired door, Elevator No. 2 entrance, clock and other glazed door/screen bays
IMG_1097 · sheet-W217 · View drawing ↗Drawing notation: 6'-9 3/4"
Existing text re-audit and existing verified elevator package; images not reopened. Bay P directory, paired door, Elevator No. 2 entrance, clock and other glazed door/screen bays
IMG_1098 · sheet-W217 · View drawing ↗Drawing notation: 6'-9 3/4"
Existing text re-audit and existing verified elevator package; images not reopened. Bay P directory, paired door, Elevator No. 2 entrance, clock and other glazed door/screen bays
IMG_1305 · sheet-W217 · View drawing ↗Drawing notation: 6'-9 3/4"
Existing text re-audit and existing verified elevator package; images not reopened. Bay P directory, paired door, Elevator No. 2 entrance, clock and other glazed door/screen bays
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · printed
Bay P plan chain segment 19 · Elevator No. 2 finished entrance plan width
3'-6"3.5 ft
Printed W217 PLAN OF BAY P segment. Assignment is bounded to the visible plan/elevation correspondence; unclassified construction remains unclassified.
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived
Elevator No. 2 finished-entrance south-edge station from source-plan start
19'-7 1/2"19.625 ft
Plan station at the finished entrance's first inside jamb face; not a rough opening or wall cut.
IMG_1095 · sheet-W217 · Locate on drawing ↗Drawing notation: 3'-6" ELEVATOR No. 2 entrance
Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.
Calculated from: W217-bay-p-plan-chain-01-south-directory-end-return, W217-bay-p-plan-chain-02-south-directory-terminal-field, W217-bay-p-plan-chain-03-south-directory-jamb, W217-bay-p-plan-chain-04-directory-case-width, W217-bay-p-plan-chain-05-directory-inner-jamb, W217-bay-p-plan-chain-06-directory-transition-field, W217-bay-p-plan-chain-07-directory-to-door-field, W217-bay-p-plan-chain-08-door-left-outer-trim, W217-bay-p-plan-chain-09-door-left-inner-trim, W217-bay-p-plan-chain-10-door-left-ornament, W217-bay-p-plan-chain-11-door-left-leaf, W217-bay-p-plan-chain-12-door-right-leaf, W217-bay-p-plan-chain-13-door-right-ornament, W217-bay-p-plan-chain-14-door-right-inner-trim, W217-bay-p-plan-chain-15-door-right-outer-trim, W217-bay-p-plan-chain-16-door-to-elevator-field, W217-bay-p-plan-chain-17-elevator-transition-field, W217-bay-p-plan-chain-18-elevator-inner-jamb
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived
Elevator No. 2 finished-entrance center station from source-plan start
21'-4 1/2"21.375 ft
Source-plan center station converted to building coordinates by the checked Bay P/W3 registration.
IMG_1095 · sheet-W217 · Locate on drawing ↗Drawing notation: 3'-6" ELEVATOR No. 2 entrance
Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.
Calculated from: W217-bay-p-plan-chain-01-south-directory-end-return, W217-bay-p-plan-chain-02-south-directory-terminal-field, W217-bay-p-plan-chain-03-south-directory-jamb, W217-bay-p-plan-chain-04-directory-case-width, W217-bay-p-plan-chain-05-directory-inner-jamb, W217-bay-p-plan-chain-06-directory-transition-field, W217-bay-p-plan-chain-07-directory-to-door-field, W217-bay-p-plan-chain-08-door-left-outer-trim, W217-bay-p-plan-chain-09-door-left-inner-trim, W217-bay-p-plan-chain-10-door-left-ornament, W217-bay-p-plan-chain-11-door-left-leaf, W217-bay-p-plan-chain-12-door-right-leaf, W217-bay-p-plan-chain-13-door-right-ornament, W217-bay-p-plan-chain-14-door-right-inner-trim, W217-bay-p-plan-chain-15-door-right-outer-trim, W217-bay-p-plan-chain-16-door-to-elevator-field, W217-bay-p-plan-chain-17-elevator-transition-field, W217-bay-p-plan-chain-18-elevator-inner-jamb, W217-bay-p-plan-chain-19-elevator-finished-entrance-width
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived
Elevator No. 2 analytical finished-entrance center · world west/east coordinate
63.454586596548396 ft63.454587 ft
Accepted only for the zero-thickness finished-entrance evidence envelope.
IMG_1095 · sheet-W217 · Locate on drawing ↗Drawing notation: PLAN OF BAY P; ELEVATOR No. 2
Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.
IMG_1202 · sheet-W3 · Locate on drawing ↗Drawing notation: BAY P; ELEVATOR NO. 2
The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.
Calculated from: W217-bay-p-plan-elevator-entrance-center-station, W217-bay-p-W3-rotation-y
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived
Elevator No. 2 analytical finished-entrance base · local vertical coordinate
0 ft · first-floor finished-floor datum0 ft
Envelope base coordinate only; threshold and sill construction remain unresolved.
IMG_1095 · sheet-W217 · Locate on drawing ↗Drawing notation: FIN. FIRST FLOOR
Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.
Calculated from: frame-first-floor-finish
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived
Elevator No. 2 analytical finished-entrance center · world south/north coordinate
50.604939757495075 ft50.60494 ft
Accepted only for the zero-thickness finished-entrance evidence envelope.
IMG_1095 · sheet-W217 · Locate on drawing ↗Drawing notation: PLAN OF BAY P; ELEVATOR No. 2
Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.
IMG_1202 · sheet-W3 · Locate on drawing ↗Drawing notation: BAY P; ELEVATOR NO. 2
The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.
Calculated from: W217-bay-p-plan-elevator-entrance-center-station, W217-bay-p-W3-rotation-y
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived
Elevator No. 2 analytical finished-entrance plane rotation about building Y
-1.5873855067559648 rad-1.587386 rad
Zero-thickness elevation plane only.
IMG_1095 · sheet-W217 · Locate on drawing ↗Drawing notation: PLAN OF BAY P
Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.
IMG_1202 · sheet-W3 · Locate on drawing ↗Drawing notation: BAY P
The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.
Calculated from: W217-bay-p-W3-rotation-y
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived
Elevator No. 2 analytical finished-entrance envelope placement
Accepted · zero-thickness evidence review onlyW217 supplies an exact symmetric 24'-11" Bay P plan, a 6-foot central paired door, and a separately chained 3'-6" Elevator No. 2 finished entrance. Centering that exact plan on the independently labeled W3 Bay P wall leaves 1.256-foot endpoint residuals and a 1.468-foot held-out door-center residual, both within W3's recorded 2-foot trace uncertainty. The W3 door trace is only 3.9 feet wide and its south endpoint fails the 2-foot check, so it is treated as an incomplete swing-arc trace and is not used to resize the verified W217 leaves. A separate old W3 line classified as the Elevator No. 2 threshold is 6.957 feet from the W217-predicted entrance center and differs in orientation by 89.695 degrees; targeted review confirms it is not the Bay P-parallel entrance plane, so that provisional trace is disputed and excluded. The checked registration places the zero-thickness analytical door leaves and Elevator No. 2 finished-entrance envelope only; it does not establish physical wall, frame, shaft, cab, or equipment geometry.
IMG_1095 · sheet-W217 · Locate on drawing ↗Drawing notation: PLAN OF BAY P; ELEVATOR No. 2
Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.
IMG_1202 · sheet-W3 · Locate on drawing ↗Drawing notation: BAY P; ELEVATOR NO. 2
The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.
f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · observed
Elevator No. 2 physical entrance/frame/wall-cut placement
WithheldHost-wall thickness, returns, rough opening, jamb/reveal depth, frame construction, sill, doors, shaft, cab and equipment remain unresolved.
IMG_1095 · sheet-W217 · Locate on drawing ↗Drawing notation: PLAN OF BAY P
Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.
IMG_1202 · sheet-W3 · Locate on drawing ↗Drawing notation: BAY P
The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.