column-S8unreviewed · traced
world x foundation trace
34.68395629785347 ft (provisional trace)34.683956 ft · estimated uncertainty ±2.259358986 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-S8unreviewed · traced
world z foundation trace
-64.00747977558315 ft (provisional trace)-64.00748 ft · estimated uncertainty ±2.259358986 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.