column-S32unreviewed · traced
world x foundation trace
22.126515061482834 ft (provisional trace)22.126515 ft · estimated uncertainty ±2.097319752 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-S32unreviewed · traced
world z foundation trace
0.5639547308979871 ft (provisional trace)0.563955 ft · estimated uncertainty ±2.097319752 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.