column-E-C4unreviewed · traced
world x foundation trace
0.28669628572651945 ft (provisional trace)0.286696 ft · estimated uncertainty ±1.894246151 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-E-C4unreviewed · traced
world z foundation trace
106.11541237609795 ft (provisional trace)106.115412 ft · estimated uncertainty ±1.894246151 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.