column-E-C2unreviewed · traced
world x foundation trace
-19.577332556283963 ft (provisional trace)-19.577333 ft · estimated uncertainty ±1.891971825 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-E-C2unreviewed · traced
world z foundation trace
108.09463162773555 ft (provisional trace)108.094632 ft · estimated uncertainty ±1.891971825 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.