Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
column-8verified · derived
Page-right coordinate from C1
99.58333333333334 ft99.583333 ft
First-floor plan coordinates only; not yet registered to building west/north axes.
Calculated from: frame-top-column-bays, frame-left-column-bays
column-8verified · derived
Page-down coordinate from C1
0 ft0 ft
First-floor plan coordinates only; not yet registered to building west/north axes.
Calculated from: frame-top-column-bays, frame-left-column-bays
column-8verified · derived
world x
21.000000000000014 ft (calculated)21 ft
Arithmetic of verified printed column bays in the shared +X west / +Z north system; no claim of as-built survey precision.
Calculated from: column-8-plan-x, structural-registration-origin-half-span
column-8verified · derived
world z
-78.58333333333333 ft (calculated)-78.583333 ft
Arithmetic of verified printed column bays in the shared +X west / +Z north system; no claim of as-built survey precision.
Calculated from: column-8-plan-y, structural-registration-origin-half-span
column-8unreviewed · traced
world x foundation trace
21.13287881640511 ft (provisional trace)21.132879 ft · estimated uncertainty ±2.276756333 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-8unreviewed · traced
world z foundation trace
-79.56388725718455 ft (provisional trace)-79.563887 ft · estimated uncertainty ±2.276756333 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
w409-group-E03verified · printed
basePlate.B
B 3636 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-E03verified · printed
basePlate.L
L 3636 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-E03unreviewed · printed
basePlate.T
T 3¾3.75 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
w409-group-E03unreviewed · printed
topOfBasePlate.offsetFromBasementScheduleLine
10′1″The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
column-4unreviewed · printed
schedule.spliceOffsetAtFourthFloor
2′0″ SPLICE2 ft
Source review: printed-reference; individual-fabrication-level-not-accepted. Schedule bands are relational; absolute member endpoints and physical cut lengths remain unresolved.
column-4unreviewed · printed
schedule.spliceOffsetAtSixthFloor
2′0″ SPLICE2 ft
Source review: printed-reference; individual-fabrication-level-not-accepted. Schedule bands are relational; absolute member endpoints and physical cut lengths remain unresolved.
column-5unreviewed · printed
schedule.lowerSpliceOffset
2′0″2 ft
Source review: checked-master-crop; shared-stepped-boundary-reading. Schedule bands are relational; absolute member endpoints and physical cut lengths remain unresolved.
column-4illegible · printed
schedule.topOffset
TOP OF COLS [offset/reference relationship unresolved]Source review: unresolved. Schedule bands are relational; absolute member endpoints and physical cut lengths remain unresolved.
column-4unreviewed · printed
channel.section
No channel section has been transcribed from these exterior body cells.Source review: untranscribed; not-evidence-of-absence. Schedule bands are relational; absolute member endpoints and physical cut lengths remain unresolved.
column-8verified · derived
world X
printed perimeter column bay chain21 ft
Drawing elevation where applicable. verified-column-control; no finite C8/C9 strip or C12 placed pad is accepted.
column-8verified · derived
world Z
south/Madison outer-column line-78.583333 ft
Drawing elevation where applicable. verified-column-control; no finite C8/C9 strip or C12 placed pad is accepted.