Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
column-63unreviewed · traced
world x foundation trace
-20.335707295837995 ft (provisional trace)-20.335707 ft · estimated uncertainty ±2.034499501 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-63unreviewed · traced
world z foundation trace
27.929446294662778 ft (provisional trace)27.929446 ft · estimated uncertainty ±2.034499501 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
w409-group-L08verified · printed
basePlate.B
B 3333 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-L08verified · printed
basePlate.L
L 3636 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-L08unreviewed · printed
basePlate.T
T 3¾3.75 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
w409-group-L08unreviewed · printed
topOfBasePlate.offsetFromBasementScheduleLine
2′3″The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.