Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
column-57unreviewed · traced
world x foundation trace
33.67484333412102 ft (provisional trace)33.674843 ft · estimated uncertainty ±2.082777785 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-57unreviewed · traced
world z foundation trace
14.344757975271065 ft (provisional trace)14.344758 ft · estimated uncertainty ±2.082777785 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
w409-group-L15verified · printed
basePlate.B
B 2929 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-L15verified · printed
basePlate.L
L 3232 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-L15unreviewed · printed
basePlate.T
T 3¼3.25 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
w409-group-L15unreviewed · printed
topOfBasePlate.offsetFromBasementScheduleLine
2′6″The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.