Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
column-44unreviewed · traced
world x foundation trace
-62.45379858279911 ft (provisional trace)-62.453799 ft · estimated uncertainty ±2.088839957 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-44unreviewed · traced
world z foundation trace
-0.07105556316942035 ft (provisional trace)-0.071056 ft · estimated uncertainty ±2.088839957 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
w409-group-I07verified · printed
basePlate.B
B 3434 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-I07verified · printed
basePlate.L
L 3636 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-I07unreviewed · printed
basePlate.T
T 3¾3.75 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.