Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
column-23unreviewed · traced
world x foundation trace
62.831488542503536 ft (provisional trace)62.831489 ft · estimated uncertainty ±2.280563975 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-23unreviewed · traced
world z foundation trace
-56.255810226823094 ft (provisional trace)-56.25581 ft · estimated uncertainty ±2.280563975 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
w409-group-I02verified · printed
basePlate.B
B 3737 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-I02verified · printed
basePlate.L
L 4040 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-I02unreviewed · printed
basePlate.T
T 4¼4.25 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.