Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
column-19unreviewed · traced
world x foundation trace
6.922572136129604 ft (provisional trace)6.922572 ft · estimated uncertainty ±2.187338187 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-19unreviewed · traced
world z foundation trace
-49.09434905965718 ft (provisional trace)-49.094349 ft · estimated uncertainty ±2.187338187 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
w409-group-L04verified · printed
basePlate.B
B 4040 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-L04verified · printed
basePlate.L
L 4545 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-L04unreviewed · printed
basePlate.T
T 4¼4.25 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
w409-group-L04unreviewed · printed
topOfBasePlate.offsetFromBasementScheduleLine
1′9″The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.