Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
column-18unreviewed · traced
world x foundation trace
-6.870667148164795 ft (provisional trace)-6.870667 ft · estimated uncertainty ±2.175380323 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-18unreviewed · traced
world z foundation trace
-49.325050625585085 ft (provisional trace)-49.325051 ft · estimated uncertainty ±2.175380323 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
w409-group-L03verified · printed
basePlate.B
B 1212 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-L03verified · printed
basePlate.L
L 1414 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
w409-group-L03unreviewed · printed
basePlate.T
T 11 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
w409-group-L03unreviewed · printed
topOfBasePlate.offsetFromBasementScheduleLine
0′6″The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.