Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
frame-first-floor-finishverified · printed
first floor finish
FLOOR ELEVATION 93.2593.25 ft
First-floor framing plan finish-floor reference; datum benchmark/sea-level relationship not established.
frame-second-floor-finishverified · printed
second floor finish
FLOOR ELEVATION 114.25114.25 ft
frame-sixth-floor-finishverified · printed
sixth floor finish
FLOOR ELEVATION 160.25160.25 ft
frame-roof-high-point-scheduleverified · printed
roof high point schedule
ROOF H.P. EL. 195.42195.42 ft
Roof high point in column schedule; not a universal flat roof elevation.
frame-basement-to-firstverified · printed
basement to first
13′-0″13 ft
Floor-height column of the structural column schedule.
frame-first-to-secondverified · printed
first to second
21′-0″21 ft
Floor-height column of the structural column schedule.
frame-second-to-thirdverified · printed
second to third
11′-6″11.5 ft
Floor-height column of the structural column schedule.
frame-third-to-fourthverified · printed
third to fourth
11′-6″11.5 ft
Floor-height column of the structural column schedule.
frame-fourth-to-fifthverified · printed
fourth to fifth
11′-6″11.5 ft
Floor-height column of the structural column schedule.
frame-fifth-to-sixthverified · printed
fifth to sixth
11′-6″11.5 ft
Floor-height column of the structural column schedule.
frame-sixth-to-seventh-scheduleverified · printed
sixth to seventh schedule
13′-6″13.5 ft
Floor-height column of the structural column schedule.
frame-seventh-to-eighth-scheduleverified · printed
seventh to eighth schedule
11′-6″11.5 ft
Floor-height column of the structural column schedule.
frame-eighth-to-roof-high-pointverified · printed
eighth to roof high point
10′-2″10.166667 ft
Floor-height column of the structural column schedule.
frame-basement-schedule-finishverified · derived
basement schedule finish
80.25 ft (calculated)80.25 ft
Basement schedule floor datum; does not include locally lowered boiler-room floors.
Calculated from: frame-first-floor-finish, frame-basement-to-first
frame-third-floor-schedule-finishverified · derived
third floor schedule finish
125.75 ft (calculated)125.75 ft
Schedule-derived third-floor reference.
Calculated from: frame-second-floor-finish, frame-second-to-third
frame-fourth-floor-schedule-finishverified · derived
fourth floor schedule finish
137.25 ft (calculated)137.25 ft
Schedule-derived fourth-floor reference.
Calculated from: frame-second-floor-finish, frame-second-to-third, frame-third-to-fourth
frame-fifth-floor-schedule-finishverified · derived
fifth floor schedule finish
148.75 ft (calculated)148.75 ft
Schedule-derived fifth-floor reference.
Calculated from: frame-sixth-floor-finish, frame-fifth-to-sixth
frame-seventh-floor-schedule-finishverified · derived
seventh floor schedule finish
173.75 ft (calculated)173.75 ft
Column-schedule seventh-floor reference only. Another assigned source group reports exterior seventh datum 171.75; preserve both and resolve spatial scope.
IMG_1323 · sheet-W409 · Locate on drawing ↗Column-schedule seventh-floor reference only. Another assigned source group reports exterior seventh datum 171.75; preserve both and resolve spatial scope. Calculation: 160.25 + 13.5
Calculated from: frame-sixth-floor-finish, frame-sixth-to-seventh-schedule
frame-eighth-floor-schedule-finishverified · derived
eighth floor schedule finish
185.25 ft (calculated)185.25 ft
Column-schedule eighth-floor reference only.
Calculated from: frame-sixth-floor-finish, frame-sixth-to-seventh-schedule, frame-seventh-to-eighth-schedule
frame-roof-high-point-chain-checkverified · derived
roof high point chain check
195.41666666666666 ft (calculated)195.416667 ft
Arithmetic result 195.4166667 rounds to printed roof H.P.195.42.
Calculated from: frame-eighth-floor-schedule-finish, frame-eighth-to-roof-high-point
frame-first-floor-steel-tag-exampleverified · printed
first floor steel tag example
NOTE: ELEVATIONS OF STEEL SHOWN THUS (-6″) ARE TO TOP OF STEEL AND RELATIVE TO FINISH FLOOR ELEVATION 93.25-6 in
Interpretation convention for individual steel member tags; exceptions occur. This does not establish one elevation for every beam.
IMG_1314 · sheet-W400 · Locate on drawing ↗Drawing notation: NOTE: ELEVATIONS OF STEEL SHOWN THUS (-6″) ARE TO TOP OF STEEL AND RELATIVE TO FINISH FLOOR ELEVATION 93.25
Interpretation convention for individual steel member tags; exceptions occur. This does not establish one elevation for every beam.
frame-first-floor-minus6-top-steelverified · derived
first floor minus6 top steel
92.75 ft (calculated)92.75 ft
Only steel members actually tagged -6″.
Calculated from: frame-first-floor-finish, frame-first-floor-steel-tag-example
frame-sixth-floor-steel-tag-exampleverified · printed
sixth floor steel tag example
NOTE: ELEVATIONS OF STEEL SHOWN THUS (-5″) ARE TO TOP OF STEEL AND RELATIVE TO FINISH FLOOR ELEVATION 160.25-5 in
Interpretation convention for individual steel member tags; exceptions occur.
IMG_1318 · sheet-W404 · Locate on drawing ↗Drawing notation: NOTE: ELEVATIONS OF STEEL SHOWN THUS (-5″) ARE TO TOP OF STEEL AND RELATIVE TO FINISH FLOOR ELEVATION 160.25
Interpretation convention for individual steel member tags; exceptions occur.
frame-sixth-floor-minus5-top-steelverified · derived
sixth floor minus5 top steel
159.83333333333334 ft (calculated)159.833333 ft
Only steel members actually tagged -5″.
Calculated from: frame-sixth-floor-finish, frame-sixth-floor-steel-tag-example
frame-lightcourt-skylight-roof-lowverified · printed
lightcourt skylight roof low
Low Point of Skylight Roof EL.114.25114.25 ft
Local roof section in light court.
frame-lightcourt-skylight-roof-highverified · printed
lightcourt skylight roof high
High Point of Skylt. Roof EL.114.75114.75 ft
Local roof section at columns 63–64 and 65–66.
frame-outer-column-centerline-widthverified · printed
outer column centerline width
157′-2″157.166667 ft
C1–C12, outer column centerlines. Not overall exterior masonry envelope.
frame-outer-column-centerline-depthverified · printed
outer column centerline depth
157′-2″157.166667 ft
C1–C85, outer column centerlines. Not overall exterior masonry envelope.
frame-top-column-baysverified · printed
Bay 1 dimension
15′-7″15.583333 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 2 dimension
14′-0″14 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 3 dimension
15′-0″15 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 4 dimension
13′-0″13 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 5 dimension
14′-0″14 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 6 dimension
14′-0″14 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 7 dimension
14′-0″14 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 8 dimension
13′-0″13 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 9 dimension
15′-0″15 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 10 dimension
14′-0″14 ft
C1 through C12, page left to right.
frame-top-column-baysverified · printed
Bay 11 dimension
15′-7″15.583333 ft
C1 through C12, page left to right.
frame-top-column-baysverified · derived
Dimension-chain total
157.166667 ft157.166667 ft
C1 through C12, page left to right.
Calculated from: frame-top-column-bays-1, frame-top-column-bays-2, frame-top-column-bays-3, frame-top-column-bays-4, frame-top-column-bays-5, frame-top-column-bays-6, frame-top-column-bays-7, frame-top-column-bays-8, frame-top-column-bays-9, frame-top-column-bays-10, frame-top-column-bays-11