Concrete beam schedule B9
Research representation: none. Architectural checks: pending.
Floor assignment pending
7 recorded properties
Still to extract or check- Beam width/depth numbers and stirrup sequence units remain unlabeled in this table; no unit guessed.
- Beam straight/bent/top rod fractions remain too soft for a fully verified row-by-row transcription.
- Table quantities are type components, not building-wide installed quantities.
- Other sheet regions, fine notes, schedules, callouts and revisions remain unreviewed.
- Complete source-to-instance registration, connection capacities, material grades and independent model/as-built checks remain pending.