First-floor COL63 beam and pipe-space detail
Research representation: none. Architectural checks: pending.
First floor · Original mark: COL. 63
9 recorded properties
Still to extract or check- Full pipe-space width and beam width unresolved; 8-inch witness is the intervening interval only.
- S-mark nominal diameter and complete duct/pipe specification unresolved.
- Installed instances, governing issue, material/finish and source-to-building registration remain unresolved.
- Unvisited notes, schedules, branches, revisions and companion details remain to review; no whole-source completion.
- Extraction partial; modeling/checking unchecked; no authoring or architectural release.