Second floor plumbing
Research representation: none. Architectural checks: pending.
Floor assignment pending
9 recorded properties
Still to extract or check- Partial 1000px JPEG65 locator only; all fine callouts, numeric dimensions and note regions require targeted follow-up
- MEP underlay does not establish exact architectural room geometry
- Register physical service instances, quantities, materials, pipe/circuit sizes and connections
- Separate original printed linework from colored marks, signatures and revisions