Room 402 corridor partition · physical pilot
Research representation: none. Architectural checks: pending.
Fourth floor · Original mark: 402
28 recorded properties
Still to extract or check- Source-pick both Room 402-side and corridor-side faces at the same stations, classify finish or construction boundaries, and independently verify the printed 4-inch witness connects those faces.
- Pick the wall's two true terminations at its demising intersections; split it at the door with exact two-jamb coordinates and verify the opening width, head and threshold against a door schedule or detail.
- Close reciprocal Room 402/corridor/Room 443 face and door topology, including more than one check of the 7-foot clear corridor witness.
- Validate the frozen W-6 transform locally for classified physical faces and carry uncertainty into canonical X/Z coordinates.
- Establish the wall's physical base and top from an applicable section, ceiling/slab detail or schedule; the 137.25 finished-floor datum and 11.5-foot story interval alone do not give wall height.
- Assign applicable wall assembly and finish layers, material, rating and quantities from the relevant schedule/details.