Boiler room and oil tank plumbing/heating sections — bounded followup
Research representation: none. Architectural checks: pending.
Floor assignment pending
10 recorded properties
Still to extract or check- Complete pipe/fixture instance tracing and connection topology; remaining numeric callouts outside targeted core
- Fixture specification/material schedules and governing companion plumbing details
- Room and architectural companion-plan registration; no accepted room geometry or installed state
- Full note, annotation, revision and schedule reconciliation at master crop resolution