Door candidate 21-corridor
Research representation: boundary trace. Architectural checks: pending.
Basement
null; observed connections: b-room-21 ↔ b-corridor-system. Exact host wall remains unresolved.
Source relationships · not a verified physical connection
- connects (observed, unreviewed): 21 · FEMALE CUSTODIAN EMPLOYEES CORRIDOR
9 recorded properties · Room assignment not established
Still to extract or check- Exact host wall/jamb station
- Printed width and height
- Head/sill elevations
- Hardware and final level connection