Elevator No. 2 analytical finished-entrance center · world west/east coordinate
63.454586596548396 ft63.454587 ft
Accepted only for the zero-thickness finished-entrance evidence envelope.
Drawing notation: PLAN OF BAY P; ELEVATOR No. 2
Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.
Drawing notation: BAY P; ELEVATOR NO. 2
The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.
Calculated from: W217-bay-p-plan-elevator-entrance-center-station, W217-bay-p-W3-rotation-y