IMG_1339 · Folder 186Plumbing Heating And Lighting
Original sheet identity has not yet been reconciled.
Extraction: Reviewed · extraction partial. Partial timed visual review: Text-first OCR/catalogue/report review, then one sequential <=1000px JPEG65 locator. Actual clockwise reading rotation 0 degrees. Raw normalized access-image coordinates before rotation. Partial only. Partial timed visual review: Text-first reuse of prior packages/OCR/queue only in this additive pass; no source image reopened. Partial timed visual review: Prior text evidence reused; source not reopened in this pass. Partial timed visual review: Prior OCR/report followed by targeted apparatus crop; partial fine evidence only. Partial timed visual review: Printed design evidence only; no installed count, room geometry or model acceptance. Partial timed visual review: Additive source-local lighting review; source regions normalized in unrotated access-image coordinates. Printed numbers are preserved separately from fixture types. No world coordinates, complete extraction or installed acceptance. Partial timed visual review: undefined Partial timed visual review: undefined Partial timed visual review: undefined Partial timed visual review: Additive partial source-local review; no accepted geometry or installed state. Partial timed visual review: Bounded source-local service evidence only; no physical coordinates, installed quantity or architectural release. Partial timed visual review: undefined Partial timed visual review: Bounded additive source review. Printed schedule quantities and source-local apparatus detail dimensions do not establish installed building geometry.
Highlighted reading: STAIR D. Partial localized apparatus review only; room underlay does not establish geometry.
Show every recorded property on this drawing →
Unresolved extraction work
- Partial 1000px JPEG65 locator only; all fine callouts, numeric dimensions and note regions require targeted follow-up
- MEP underlay does not establish exact architectural room geometry
- Register physical service instances, quantities, materials, pipe/circuit sizes and connections
- Separate original printed linework from colored marks, signatures and revisions
- Complete service-instance topology and room registration remain unresolved.
- Governing fixture/material schedules and revision authority remain unresolved.
- All unvisited regions require source-resolution review; modeling/checking unchecked.
- Unvisited regions, schedules, annotations and companion details still require source-resolution review.
- Installed service-instance topology, material schedules, room registration and governing revision remain unresolved.
- Modeling and checking remain unchecked.
- Final radiator schedule inlet/vent/stud cell blank; shared-value intent remains unresolved.
- Individual service routes, pipe sizes, fixture identities and room registrations remain to be reviewed at source resolution.
- Original/revised annotation authority and companion details unresolved.
- No architectural outlines or model geometry inferred; modeling status unchecked.
- Trace complete service connections and associate with architectural rooms.
- Resolve materials, fixture specifications and governing revision.
- Unvisited annotations and companion details remain pending; modeling and checking unchecked.
- Printed symbol legend linking electrical outlet symbols to lighting specimen type marks
- Fixture dimensions, materials and finishes
- Accepted source-to-room/floor spatial registration and installed anchor height
- As-built installation and revision authority
- All unvisited notes, schedules, linework, callouts and companion details still require review
- Drop-cord installation, counts, fixture type equivalence and exceptions unresolved.
- Motor horsepower, apparatus capacity and other notes/routes remain open.
- Governing revision and architectural registration remain unchecked.
- Governing historical issue and as-built installation unresolved.
- Architectural registration, installed quantities and physical geometry unchecked.
- Unvisited notes, routes, schedules, callouts and companion details remain open; no whole-source completion or irrecoverable-gap claim.
- Motor horsepower and apparatus capacity not reattempted without new evidence.
- Governing original/revision authority and actual installation unresolved.
- Architectural registration, room polygons, installed counts and physical routes unchecked.
- Other regions, notes, schedules, callouts and companion details require review.
- 25W drop-cord default reused as earlier text reading only, scoped UNLESS OTHERWISE NOTED; legacy candidate review retained, no newly verified wattage or whole-floor generalization.
- Complete branch endpoints and fixture identity require companion details and tracing.
- Printed room identifiers and architectural-room registration unresolved.
- Material, finish, fixture specification and installed quantity unresolved.
- Remaining notes, riser sizes and revisions need source-resolution review; modeling/checking unchecked.
- Complete unvisited notes, schedules, callouts, branches, margins and companion details need source-resolution review.
- Governing historical revisions, installed quantities, architectural room registration and as-built correspondence remain unresolved.
- Extraction remains partial; modeling/checking unchecked; no irrecoverable-gap conclusion.
- Historical revision authority and actual installation unresolved.
- Architectural registration, installed counts and physical geometry unchecked.
- Remaining regions, notes, schedules, routes and companion details require review.
- Motor horsepower and apparatus capacities still unreadable; reference number does not close those numeric questions.
- Full source-to-building registration, installed quantities and as-built correspondence remain unresolved.
- Complete notes, schedules, callouts, margins and colored revision authority outside listed regions await review.
- Extraction remains partial; modeling/checking unchecked. No irrecoverable evidence conclusion.
Download OCR observations (unverified)