Gus J. SolomonUnited States Courthouse
← Back to the building1933 reconstruction · research preview

The measured building.

Every dimension belongs to an object and a drawing. Original room numbers, object marks, printed values and source regions stay together—even when the answer is unresolved.

Source photographs
464
Identified objects
4872
Verified printed values
12046
Disputed values
20

464 of 464 photographs have extraction records, containing 27,517 properties. Initial image review is not exhaustive extraction: 0 photographs have passed the full-region check. 66 numbered sheets are reconciled. Modeling and architectural registration are separate work; these counts do not establish a complete building.

Download the structured register (JSON)

Open the coordinated research model →

Clear filters
IMG_1329 · Folder 186

DETAILS OF FRAMING FOR FRONT ENTRANCE STEPS

Sheet W415

Extraction: Reviewed · extraction partial. targeted regions only; front-entrance framing plan P1 mark; concrete slab schedule P1 row; six-inch ground-slab note; sheet title block. Partial timed visual review: 2026-10-11 remaining-region review. Prior queue, OCR and packages reused; ten sequential inspections total, confined to IMG_1329/1334/1336/1337. Normalized regions in unrotated complete-upright WebP. Research only; no accepted geometry or complete extraction. Partial timed visual review: Additive source-local review; normalized coordinates in unrotated 2200×1650 access WebP. Reuse previous verified records; no accepted geometry or complete extraction. Partial timed visual review: undefined Partial timed visual review: Bounded additive source review. Printed schedule quantities and source-local apparatus detail dimensions do not establish installed building geometry. Partial timed visual review: Selected general notes only; normalized region in unrotated 2200×1650 derivative. Existing verified readings reused without retranscription. Partial timed visual review: Source-local schedule, fabrication or connection evidence only; no installed geometry or architectural acceptance. Partial timed visual review: undefined Partial timed visual review: undefined

Unresolved extraction work
  • other structural schedules
  • unrelated wall/footing details
  • full plan dimension and reinforcement audit
  • Remaining individual dimensions, service/member instances, schedules, material and connection details require source review.
  • Original/revised annotation authority and companion registrations remain unresolved.
  • Architectural geometry and installed quantities are not established by service underlays.
  • Remaining individual dimensions, service instances, fine callouts and routes require source review.
  • Original/revised annotations, companion sheets and installed registration unresolved.
  • Architectural geometry and installed quantities are not established; model unchecked.
  • Beam width/depth numbers and stirrup sequence units remain unlabeled in this table; no unit guessed.
  • Beam straight/bent/top rod fractions remain too soft for a fully verified row-by-row transcription.
  • Table quantities are type components, not building-wide installed quantities.
  • Other sheet regions, fine notes, schedules, callouts and revisions remain unreviewed.
  • Complete source-to-instance registration, connection capacities, material grades and independent model/as-built checks remain pending.
  • Full source-to-building registration, installed quantities and as-built correspondence remain unresolved.
  • Complete notes, schedules, callouts, margins and colored revision authority outside listed regions await review.
  • Extraction remains partial; modeling/checking unchecked. No irrecoverable evidence conclusion.
  • Full concrete beam/slab schedule row extraction
  • Companion details, revisions and member assignments
  • Complete source-to-plan registration and installed-instance applicability remain unresolved.
  • Unreviewed sheet regions, notes, callouts, schedules and revision authority remain open.
  • Material grades, full profiles, connection capacities and independent modeling checks unresolved.
  • 1/5 clear-span top bend and3/4 effective-depth separation close four repeated null clause questions only.
  • Unlabeled beam width/depth and stirrup-sequence units remain unknown; type-component counts do not establish installed quantities.
  • Complete source-to-instance and endpoint registration remains unresolved.
  • Material grades, finishes, connection capacities and as-built checks remain unestablished.
  • Unreviewed regions, fine fractions, schedules, companion applicability and revision authority remain open.
  • Beam WIDTH/DEPTH header still has no independently established physical unit. Adjacent slab DEPTH inch marks are in a different table and do not authorize beam units.
  • No dimensional closure from repeated unitless numeric glyphs; all beam width/depth unit questions remain open.
  • Full source-to-instance assignment, physical endpoints, installed quantities and governing revision remain unresolved.
  • Unreviewed regions, notes, fine fractions and companion sheets remain open; this package is not exhaustive coverage.
  • No world geometry, material grade, structural capacity or model acceptance established.

Download OCR observations (unverified)

Loading the selected drawing…

Scroll or pinch to inspect this drawing. Archival drawing photograph · Oregon Historical Society research collections.

Open source image separately ↗

105 matching properties

Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.

framingcells1013m-img1329-slab-schedule-p3verified · printed

spacer_quantity

2-½ φ

2 count

P3 spacer component quantity in schedule; not installed count.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 2-½ φ

P3 spacer component quantity in schedule; not installed count.

framingcells1013m-img1329-slab-schedule-p3verified · printed

spacer_designation

2-½ φ

Literal spacer designation; numeric diameter unit not guessed.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 2-½ φ

Literal spacer designation; numeric diameter unit not guessed.

framingcells1013m-img1329-slab-schedule-p3verified · printed

reinforcement_method

STR. RODS ONLY

Printed source-local detail/type property only; no installed instance, coordinates, quantity or manufactured rolled profile inferred.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: STR. RODS ONLY

Printed source-local detail/type property only; no installed instance, coordinates, quantity or manufactured rolled profile inferred.

detail-img1329-20261011o-general-reinforcementverified · printed

continuous_span_top_bend_distance_rule

MAKE THE TOP BEND AT A DISTANCE FROM THE CENTER OF THE COLUMN EQUAL TO 1/5 CLEAR SPAN

0.2 ratio

Printed beam reinforcement rule; ratio only, no span or member length calculated.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: MAKE THE TOP BEND AT A DISTANCE FROM THE CENTER OF THE COLUMN EQUAL TO 1/5 CLEAR SPAN

Printed beam reinforcement rule; ratio only, no span or member length calculated.

detail-img1329-20261011o-general-reinforcementverified · printed

multiple_rod_bend_point_spacing_rule

IF MORE THAN TWO RODS ARE BENT THEY MAY BE BENT AT TWO POINTS NOT MORE THAN 3/4 EFFECTIVE DEPTH APART

0.75 ratio

Printed maximum bend-point spacing as fraction of effective depth; no member depth established.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: IF MORE THAN TWO RODS ARE BENT THEY MAY BE BENT AT TWO POINTS NOT MORE THAN 3/4 EFFECTIVE DEPTH APART

Printed maximum bend-point spacing as fraction of effective depth; no member depth established.

detail-img1329-20261011o-general-reinforcementverified · printed

beam_bend_angle_dependency

IN BEAMS BEND UP BENT RODS AT AN ANGLE OF 30° TO 45° DEPENDING UPON THE RATIO OF DEPTH TO SPAN

Bend angle depends on depth/span ratio. Existing 30°–45° limits reused; this sentence does not print a numerical depth/span threshold.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: IN BEAMS BEND UP BENT RODS AT AN ANGLE OF 30° TO 45° DEPENDING UPON THE RATIO OF DEPTH TO SPAN

Bend angle depends on depth/span ratio. Existing 30°–45° limits reused; this sentence does not print a numerical depth/span threshold.

structsched1013g-img1329-beam-schedule-b1verified · printed

scheduled_width_notation

12

Front entrance-step concrete beam schedule row B1; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B1; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b1verified · printed

scheduled_depth_notation

30

Front entrance-step concrete beam schedule row B1; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B1; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b1unreviewed · printed

scheduled_width_numeric

12

Numeric value unresolved

Front entrance-step concrete beam schedule row B1; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B1; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b1unreviewed · printed

scheduled_depth_numeric

30

Numeric value unresolved

Front entrance-step concrete beam schedule row B1; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B1; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b1verified · printed

straight_rod_quantity

2 - [rod fraction unresolved] φ

2 count

Type-component quantity in B1 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 2 - [rod fraction unresolved] φ

Type-component quantity in B1 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

structsched1013g-img1329-beam-schedule-b1verified · printed

stirrup_omission

NONE

B1 STIRRUPS spacing cell prints NONE; no universal omission.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: NONE

B1 STIRRUPS spacing cell prints NONE; no universal omission.

structsched1013g-img1329-beam-schedule-b2verified · printed

scheduled_width_notation

12

Front entrance-step concrete beam schedule row B2; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B2; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b2verified · printed

scheduled_depth_notation

30

Front entrance-step concrete beam schedule row B2; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B2; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b2unreviewed · printed

scheduled_width_numeric

12

Numeric value unresolved

Front entrance-step concrete beam schedule row B2; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B2; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b2unreviewed · printed

scheduled_depth_numeric

30

Numeric value unresolved

Front entrance-step concrete beam schedule row B2; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B2; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b2verified · printed

straight_rod_quantity

2 - [rod fraction unresolved] φ

2 count

Type-component quantity in B2 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 2 - [rod fraction unresolved] φ

Type-component quantity in B2 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

structsched1013g-img1329-beam-schedule-b3verified · printed

scheduled_width_notation

12

Front entrance-step concrete beam schedule row B3; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B3; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b3verified · printed

scheduled_depth_notation

30

Front entrance-step concrete beam schedule row B3; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B3; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b3unreviewed · printed

scheduled_width_numeric

12

Numeric value unresolved

Front entrance-step concrete beam schedule row B3; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B3; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b3unreviewed · printed

scheduled_depth_numeric

30

Numeric value unresolved

Front entrance-step concrete beam schedule row B3; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B3; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b3verified · printed

straight_rod_quantity

3 - [rod fraction unresolved] φ

3 count

Type-component quantity in B3 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 3 - [rod fraction unresolved] φ

Type-component quantity in B3 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

structsched1013g-img1329-beam-schedule-b4verified · printed

scheduled_width_notation

12

Front entrance-step concrete beam schedule row B4; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B4; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b4verified · printed

scheduled_depth_notation

30

Front entrance-step concrete beam schedule row B4; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B4; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b4unreviewed · printed

scheduled_width_numeric

12

Numeric value unresolved

Front entrance-step concrete beam schedule row B4; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B4; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b4unreviewed · printed

scheduled_depth_numeric

30

Numeric value unresolved

Front entrance-step concrete beam schedule row B4; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B4; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b4verified · printed

straight_rod_quantity

3 - [rod fraction unresolved] φ

3 count

Type-component quantity in B4 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 3 - [rod fraction unresolved] φ

Type-component quantity in B4 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

structsched1013g-img1329-beam-schedule-b5verified · printed

scheduled_width_notation

12

Front entrance-step concrete beam schedule row B5; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B5; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b5verified · printed

scheduled_depth_notation

30

Front entrance-step concrete beam schedule row B5; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B5; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b5unreviewed · printed

scheduled_width_numeric

12

Numeric value unresolved

Front entrance-step concrete beam schedule row B5; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B5; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b5unreviewed · printed

scheduled_depth_numeric

30

Numeric value unresolved

Front entrance-step concrete beam schedule row B5; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B5; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b5verified · printed

straight_rod_quantity

3 - [rod fraction unresolved] φ

3 count

Type-component quantity in B5 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 3 - [rod fraction unresolved] φ

Type-component quantity in B5 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

structsched1013g-img1329-beam-schedule-b6verified · printed

scheduled_width_notation

12

Front entrance-step concrete beam schedule row B6; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B6; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b6verified · printed

scheduled_depth_notation

30

Front entrance-step concrete beam schedule row B6; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B6; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b6unreviewed · printed

scheduled_width_numeric

12

Numeric value unresolved

Front entrance-step concrete beam schedule row B6; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B6; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b6unreviewed · printed

scheduled_depth_numeric

30

Numeric value unresolved

Front entrance-step concrete beam schedule row B6; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B6; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header. Unit must be verified before a numeric length is normalized.

structsched1013g-img1329-beam-schedule-b6verified · printed

straight_rod_quantity

2 - [rod fraction unresolved] φ

2 count

Type-component quantity in B6 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 2 - [rod fraction unresolved] φ

Type-component quantity in B6 STR.RODS cell only; nominal rod fraction, physical size and installed count remain separate.

structsched1013g-img1329-beam-schedule-b7verified · printed

scheduled_width_notation

12

Front entrance-step concrete beam schedule row B7; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 12

Front entrance-step concrete beam schedule row B7; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

structsched1013g-img1329-beam-schedule-b7verified · printed

scheduled_depth_notation

30

Front entrance-step concrete beam schedule row B7; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

IMG_1329 · W-415 · Locate on drawing ↗

Drawing notation: 30

Front entrance-step concrete beam schedule row B7; no installed beam inventory or world geometry. WIDTH/DEPTH cells have no unit printed in inspected header.

View all source photographs →