Gus J. SolomonUnited States Courthouse
← Back to the building1933 reconstruction · research preview

The measured building.

Every dimension belongs to an object and a drawing. Original room numbers, object marks, printed values and source regions stay together—even when the answer is unresolved.

Source photographs
464
Identified objects
4872
Verified printed values
12046
Disputed values
20

464 of 464 photographs have extraction records, containing 27,517 properties. Initial image review is not exhaustive extraction: 0 photographs have passed the full-region check. 66 numbered sheets are reconciled. Modeling and architectural registration are separate work; these counts do not establish a complete building.

Download the structured register (JSON)

Open the coordinated research model →

Clear filters
IMG_1314 · Folder 186

1st Floor Framing Plan

Sheet W400

Extraction: Reviewed · extraction partial. Partial: floor controls and first-floor perimeter frame; not a complete member or connection schedule. Four corner controls and six check intersections on each sheet; source orientation; existing 147-point trace set transformed arithmetically. Reuse existing first-floor finish datum only; no new inspection. C10/C11/C12 perimeter spans, C68/C82 connected framing paths, and C70/C72/C84 local perimeter spans. W400 includes C84/C96 terminal span. Text-first physical-pilot gate 3 audit; existing reviewed plan, elevation and section records reused without reopening an archival image. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. W404 support 88–89 physical beam gate; member profile/connection remains open. W404 support 88–89 physical beam gate; member profile/connection remains open. W404 support 88–89 physical beam gate; member profile/connection remains open. W404 support 88–89 physical beam gate; member profile/connection remains open. W404 support 88–89 physical beam gate; member profile/connection remains open. W404 support 88–89 physical beam gate; member profile/connection remains open. Broadway C58–C52 fourth-floor shell physical-bounds gate; control frame only. Broadway C58–C52 fourth-floor shell physical-bounds gate; control frame only. Broadway C58–C52 fourth-floor shell physical-bounds gate; control frame only. Broadway C58–C52 fourth-floor shell physical-bounds gate; control frame only. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. Main exterior center framed-entrance physical gate; no finite frame or host-wall cut authorized. Main exterior center framed-entrance physical gate; no finite frame or host-wall cut authorized. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. Partial timed visual review: Bounded source-reading review only; no full-source or geometry acceptance. Partial timed visual review: Text-only reuse, no new visual inspection. Partial timed visual review: Selected beam-connection qualification note; prior plan controls and elevations reused. Partial timed visual review: Targeted source detail only. Master orientation recorded independently from access derivatives. Region bounds are crop locators, not physical geometry. Partial timed visual review: undefined

Show coordinated geometry overlay →
Registration: provisional · 6 independent checks · maximum residual 0.766 ft.

Unresolved extraction work
  • External elevation datum / benchmark is not established in this set.
  • Only three absolute floor levels are directly printed and verified here: first93.25,second114.25,sixth160.25. Basement and floors3–5,7–8 are schedule-derived arithmetic, with explicit provenance.
  • Schedule-derived seventh173.75 may be a raised/interior region. The parallel envelope extraction reports171.75 on another sheet. Do not collapse these into one seventh-floor level until regional geometry is reconciled.
  • The parallel foundation extraction reports a boiler floor77.75; schedule basement80.25 must not override a local lowered floor.
  • Roof high point195.42 is not sufficient to establish roof slopes, low points, parapets, penthouses or eave heights.
  • Steel tags are offsets from floor datums; a single flat steel surface for each story is not supported. Other-story steel top elevations require their own framing sheets.
  • Interior column coordinates and continuation by floor are not exhaustively transcribed. This extraction includes42 perimeter columns only.
  • Photograph perspective is not rectified. Normalized regions are approximate retrieval aids only.
  • Interior offset row C16–C21 depth and light-court wall faces need explicit architectural/framing dimensions; do not derive their dimensions from apparent photograph spacing.
  • Column schedule describes historic design intent. These drawings alone do not establish as-built or later altered conditions.
  • Resolve local residuals with a flatter scan or additional constrained registration before tighter geometric use.
  • Independently recheck each of 147 source symbol centers; this pass visually refines only registration controls and checks.
  • Resolve each footing/cap center from eccentricity and offset evidence before placing foundation solids.
  • Review remaining regions and companion details before claiming complete extraction.
  • No change to existing W400 source coverage.
  • All other framing and connections
  • Interior column center eccentricities and control-offset ties
  • Vertical column continuation
  • Whole-sheet dimensions and local exceptions
  • A W-6-to-world registration solved from classified, source-picked controls with held-out plan residuals.
  • A page-right/west/Broadway W-6 chain with exact grid/column identifiers and a resolved end-chain transition.
  • A direct plan key tying one W-6 room/opening instance to opening-broadway-F4-B05/broadway-bay-05.
  • A face bridge from the W-6 room-side exterior-wall trace to W403's exterior FACE OF STONE, without assuming wall thickness.
  • A classification of the IMG_1231 visible opening envelope as the same jamb/masonry/frame boundary measured by W-6.
  • One held-out horizontal plan/elevation control with independently known station and comparable endpoints; report its residual and tolerance.
  • Review acceptance of the B05 elevation envelope host and station origin; acceptedHostElementId and acceptedStationFeet must become non-null.
  • W409 suffix a E magnitude independently read and tied to C1
  • signed footing-center minus C1-column-center X offset
  • signed footing-center minus C1-column-center Z offset
  • independent check of actual C1 pad center and two footprint edges
  • cap/pier center, depth, and bearing transform
  • reinforcement quantity and detailed geometry
  • material/finish confirmation and as-built position
  • Applicable section or section schedule establishing exact I-profile flange width and actual depth for the 10" I @ 25.4 member
  • Dimension or defensible cross-sheet control for the 88–89 beam centerline offset from its numbered support axis
  • Member-specific end bearing, cutback, plate and connection detail at columns 88 and 89
  • Check revisions and companion outside-wall sections before physical authoring
  • same-condition exterior stone to classified interior finish face depth and every intervening layer/material
  • architecturally classified north/south wall ends, joints and pier returns rather than support-axis stations
  • physical wall base/top and slab-edge interfaces rather than finished-floor schedule datums
  • independently checked W-6 to Broadway elevation horizontal registration and B05 key/host identity
  • masonry versus visible/frame/clear opening bounds, sill, head, jamb returns and reveal depth
  • W403 stone-face continuity away from the floor-beam section and across the 14-foot span
  • actual-plan attribution of the Broadway footing centerline to C24 pad center of gravity
  • signed C24 pad-center minus steel-column-center X offset
  • signed C24 pad-center minus steel-column-center Z offset, including proof of zero if centered
  • 12-foot versus 14-foot scheduled side assignment to world X/Z from attributable pad edges or printed dimensions
  • cap, base, reinforcement and as-built geometry
  • Two classified finished host-wall face stations and a closed host segment
  • Frame outer/inner face depths, actual section thickness and reveal return
  • Accepted left/right finished frame jamb stations and rough opening limits
  • Frame sill/threshold top and underside tied to the exterior landing and first-floor finish
  • Frame head elevation and vertical transom/glazing limits
  • Material/profile build-up for bronze frame and glass
  • Accepted opening cut through the host wall and as-built correspondence
  • C13 pad C.G. minus steel center signed X offset, including its side orientation
  • legible C13 footing-bottom elevation
  • cap center, thickness and bearing transform
  • reinforcement count and bar placement
  • independent/as-built check
  • printed C14 steel-column world X station or checked dimensioned tie
  • C14 pad C.G. minus steel center signed X and Z offsets, including proof of zero on either axis
  • applicable eccentricity key or direct pad-center control
  • printed C15 steel-column world X station or checked dimensioned tie
  • C15 pad C.G. minus steel center signed X and Z offsets, including proof of zero on either axis
  • Both source angle callouts visible upright at raw rotation0; previous raw rotation270 records are preserved and not overwritten. Rivet pitches, connection capacities and member fabrication remain open.
  • Complete source-to-instance registration, physical endpoints and installed quantities remain unresolved.
  • Unreviewed sheet regions, fine notes, schedules, companion applicability and revision authority remain open.
  • No world coordinates, member cut lengths, steel grades, physical wall geometry or architectural acceptance established.
  • Native angle re-read exists. Other connection rivet pitches, capacities, physical cut lengths, grades and remaining sheet regions remain open; no repeated view.
  • Installed instance allocation, quantities and source-to-building registration remain unresolved.
  • All remaining dimensions, profiles, joints, finishes and companion/revision applicability need review.
  • No accepted physical geometry or whole-source completeness established.
  • All remaining small dimension chains and endpoint classifications
  • Complete profiles, quantities and installation registration
  • Companion details and original/revision reconciliation
  • Independent geometry/model check and as-built correspondence
  • Remaining dimension endpoints and layer/material assignments not yet reviewed
  • Installed instances, quantities and plan/elevation registration unresolved
  • Companion details and revisions require reconciliation
  • Independent model/as-built checks unavailable in this extraction
  • No additional rivet diameter or pitch reading established by this crop.
  • Crop remained sideways after the recorded rotation; reuse verified connection angle and application notes.
  • Other sheet regions, fine notes, schedules, callouts and revisions remain unreviewed.
  • Complete source-to-instance registration, connection capacities, material grades and independent model/as-built checks remain pending.

Download OCR observations (unverified)

Loading the selected drawing…

Scroll or pinch to inspect this drawing. Archival drawing photograph · Oregon Historical Society research collections.

Open source image separately ↗

273 matching properties

Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.

foundation-main-7-padunreviewed · derived

footing.cgWorldX

C7; printed perimeter bay chain; 7; (-11′6″); strip edges run along Madison; longitudinal break lines

Numeric value unresolved

Column control X is 7 ft. It is not substituted for an unestablished segment center. Source audit state: blocked-by-missing-longitudinal-extent.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C7; printed perimeter bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: 7; (-11′6″); strip edges run along Madison; longitudinal break lines

Calculated from: column-7-registered-world-x, footing-7-placement-offset-x

foundation-main-7-padverified · derived

footing.transverseCGAxisWorldZ

C7; printed perimeter bay chain; 7; ℄ FOOTING; ℄ STEEL COL.; upper footing and lower steel centerline; C5; C6; C7; c; c = 2¾″; OF FOOTINGS FROM ℄ OF MAIN COLUMN ARE GIVEN BY DIMENSION E AND SUFFIX AT TOP OF SCHEDULE.

-78.8125 ft

Transverse axis only; full 3D footing center remains incomplete. Source audit state: checked-arithmetic-from-source-linked-parents.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C7; printed perimeter bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: 7; ℄ FOOTING; ℄ STEEL COL.; upper footing and lower steel centerline

IMG_1323 · sheet-W409 · Locate on drawing ↗

Drawing notation: c = 2¾″; OF FOOTINGS FROM ℄ OF MAIN COLUMN ARE GIVEN BY DIMENSION E AND SUFFIX AT TOP OF SCHEDULE.

Calculated from: column-7-registered-world-z, footing-7-placement-offset-z

control-w400-interior-68-82verified · printed

perimeter.span.C10.C11

14′0″

14 ft

Printed perimeter-support span. This does not itself dimension an interior support.

control-w400-interior-68-82verified · printed

perimeter.span.C11.C12

15′7″

15.583333 ft

Printed perimeter-support span. This does not itself dimension an interior support.

control-w400-interior-68-82verified · printed

perimeter.span.C70.C72

14′0″

14 ft

Printed perimeter-support span. This does not itself dimension an interior support.

control-w400-interior-68-82verified · printed

perimeter.span.C72.C84

14′0″

14 ft

Printed perimeter-support span. This does not itself dimension an interior support.

control-w400-interior-68-82verified · printed

perimeter.span.C84.C96

22′7″

22.583333 ft

Printed perimeter-support span. This does not itself dimension an interior support.

control-w400-interior-68-82unreviewed · observed

framing.observedLongitudinalIncidence

A connected, apparently straight beam/girder line passes through the drawn support symbols C10, C68, C82 and C94.

Observed structural incidence, not a printed zero transverse offset. Only the endpoint/support identities C10/C68/C82/C94 are assigned; intermediate marks are not transcribed in this bounded task.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C10 to C68 longitudinal framing path

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C68, C82, C94 framing path

column-68unreviewed · derived

coordinationCandidate.worldX

49′0″, conditional on zero column-center offset from the C10/C94 longitudinal framing line

49 ft

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C10–C68 framing path

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C68–C82–C94 framing path

IMG_1316 · sheet-W402 · Locate on drawing ↗

Drawing notation: C68–C82–C94 framing path

Calculated from: interior-68-82-w400-perimeter-x-station, interior-68-82-w402-perimeter-x-station, interior-68-82-w400-longitudinal-framing-incidence, interior-68-82-w402-longitudinal-framing-incidence, assumption-interior-longitudinal-framing-line-equals-column-control

column-68unreviewed · derived

coordinationCandidate.worldZ

28′0″, conditional on zero column-center offset from the transverse C68/C70 framing line

28 ft

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C68 transverse line

IMG_1316 · sheet-W402 · Locate on drawing ↗

Drawing notation: C68 transverse line

Calculated from: interior-68-82-w400-perimeter-z-70, interior-68-82-w402-perimeter-z-70, interior-68-82-w400-transverse-68-70, interior-68-82-w402-transverse-68-70, assumption-column-68-transverse-line-equals-column-control

column-82unreviewed · derived

coordinationCandidate.worldX

49′0″, conditional on zero column-center offset from the C10/C94 longitudinal framing line

49 ft

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C10–C68 framing path

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C68–C82–C94 framing path

IMG_1316 · sheet-W402 · Locate on drawing ↗

Drawing notation: C68–C82–C94 framing path

Calculated from: interior-68-82-w400-perimeter-x-station, interior-68-82-w402-perimeter-x-station, interior-68-82-w400-longitudinal-framing-incidence, interior-68-82-w402-longitudinal-framing-incidence, assumption-interior-longitudinal-framing-line-equals-column-control

column-82unreviewed · derived

coordinationCandidate.worldZ

56′0″, conditional on zero column-center offset from the transverse C82/C84 framing line

56 ft

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C82 transverse line

IMG_1316 · sheet-W402 · Locate on drawing ↗

Drawing notation: C82 transverse line

Calculated from: interior-68-82-w400-perimeter-z-84, interior-68-82-w400-transverse-82-84, interior-68-82-w402-transverse-82-84, assumption-column-82-transverse-line-equals-column-control

column-68unreviewed · inferred

Unaccepted framing incidence assumption

The connected longitudinal framing path through C10/C68/C82/C94 coincides with the exact column-control axis without an unmarked transverse offset.

The drawn beam/girder line may describe a member line or framing connection rather than the exact center of an eccentrically connected column. Schematic one-line representations do not prove zero eccentricity.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C10–C68 framing path

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C68–C82–C94 framing path

IMG_1316 · sheet-W402 · Locate on drawing ↗

Drawing notation: C68–C82–C94 framing path

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C10–C68 framing path

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C68–C82–C94 framing path

IMG_1316 · sheet-W402 · Locate on drawing ↗

Drawing notation: C68–C82–C94 framing path

column-68unreviewed · inferred

Unaccepted framing incidence assumption

Transverse framing line through C68 and perimeter C70 supplies the same Z control to both column centers.

An eccentric attachment, unrecorded local center offset or schematic beam endpoint may differ from the actual column-control center.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C68 transverse line

IMG_1316 · sheet-W402 · Locate on drawing ↗

Drawing notation: C68 transverse line

column-82unreviewed · inferred

Unaccepted framing incidence assumption

Transverse framing line through C82 and perimeter C84 supplies the same Z control to both column centers.

An eccentric attachment, unrecorded local center offset or schematic beam endpoint may differ from the actual column-control center.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C82 transverse line

IMG_1316 · sheet-W402 · Locate on drawing ↗

Drawing notation: C82 transverse line

bway-F4-horizontal-placement-gateverified · observed

Physical pilot horizontal placement gate

FAIL — no accepted plan/elevation horizontal control

The Broadway elevation and section retain candidate controls for middle bay B05, but the previously cited W-6 Rooms 401-407 plan chain is on the east/Sixth Avenue side. It cannot attach B05 to a Broadway plan bay or provide an independent horizontal plan/elevation check.

IMG_1212 · sheet-W6 · Locate on drawing ↗

Drawing notation: 14′-0″ / 4′-0″ / 6′-0″ / 4′-0″

Source-space candidate only; no pixel-distance conversion or accepted world transform.

IMG_1317 · sheet-W403 · Locate on drawing ↗

Drawing notation: FACE OF STONE; 10″; C.L. OF COL.; SECTION FOR 13′,14′ AND 15′ SPANS.

bway-F4-horizontal-placement-gateunreviewed · derived

Candidate nominal B05 bay center station

-7 ft structural candidate

-7 ft

The structural support stations are exact arithmetic, but the cited W-6 Rooms 401-407 chain is on Sixth Avenue rather than Broadway. A registered page-right/west W-6 chain with exact grid names is required before B05 can be assigned.

Calculated from: column-58-registered-world-z, column-52-registered-world-z

bway-F4-horizontal-placement-gateunreviewed · observed

Accepted opening host world X

Unresolved

Numeric value unresolved

The local middle-span exterior stone-face arithmetic is verified, but its attachment to opening-broadway-F4-B05 remains conditional, and W-6 does not register or classify that exterior face.

IMG_1212 · sheet-W6 · Locate on drawing ↗

Drawing notation: 14′-0″ / 4′-0″ / 6′-0″ / 4′-0″

Source-space candidate only; no pixel-distance conversion or accepted world transform.

IMG_1317 · sheet-W403 · Locate on drawing ↗

Drawing notation: FACE OF STONE; 10″; C.L. OF COL.; SECTION FOR 13′,14′ AND 15′ SPANS.

bway-F4-horizontal-placement-gateunreviewed · observed

Accepted opening station

Unresolved

Numeric value unresolved

All available comparisons are either numeric-only, same-sheet arithmetic, conditionally keyed, or use unlike endpoint classes. The normalized elevation registration still records horizontalIndependentCheckCount = 0 and full2dCheckRmsFeet = null.

IMG_1212 · sheet-W6 · Locate on drawing ↗

Drawing notation: 14′-0″ / 4′-0″ / 6′-0″ / 4′-0″

Source-space candidate only; no pixel-distance conversion or accepted world transform.

IMG_1317 · sheet-W403 · Locate on drawing ↗

Drawing notation: FACE OF STONE; 10″; C.L. OF COL.; SECTION FOR 13′,14′ AND 15′ SPANS.

foundation-main-4-padverified · derived

footing.cgWorldZ

-78.6875 ft (calculated)

-78.6875 ft

Nominal footing envelope only; source audit state: checked-arithmetic-from-source-linked-parents. Center is 78′8¼″ south of the project origin.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C4; perimeter bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: ℄ FOOTING; ℄ STEEL COLS

IMG_1323 · sheet-W409 · Locate on drawing ↗

Drawing notation: DISTANCES OF C. of G. OF FOOTINGS FROM C.L. OF MAIN COLUMN ARE GIVEN BY DIMENSION E AND SUFFIX AT TOP OF SCHEDULE.

Calculated from: column-4-registered-world-z, footing-4-placement-offset-z

foundation-main-4-padverified · derived

envelope.minZ

-85.6875 ft (calculated)

-85.6875 ft

Nominal footing envelope only; source audit state: checked-arithmetic-from-source-linked-parents.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C4; perimeter bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: ℄ FOOTING; ℄ STEEL COLS

IMG_1328 · Locate on drawing ↗

Drawing notation: 16′0″ × 14′0″ × 3′6″

Calculated from: footing-4-placement-center-z, footing-4-placement-span-z

foundation-main-4-padverified · derived

envelope.maxZ

-71.6875 ft (calculated)

-71.6875 ft

Nominal footing envelope only; source audit state: checked-arithmetic-from-source-linked-parents.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C4; perimeter bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: ℄ FOOTING; ℄ STEEL COLS

IMG_1328 · Locate on drawing ↗

Drawing notation: 16′0″ × 14′0″ × 3′6″

Calculated from: footing-4-placement-center-z, footing-4-placement-span-z

foundation-main-3-padunreviewed · derived

footing.cgWorldX

C3; perimeter column bay chain; 3; (-6′0″); square footprint around concrete pilaster

Numeric value unresolved

Nominal footing envelope only; source audit state: blocked-by-missing-offset. Column control is −49 ft; footing center remains null.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C3; perimeter column bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: 3; (-6′0″); square footprint around concrete pilaster

Calculated from: column-3-registered-world-x, footing-3-placement-offset-x

foundation-main-3-padunreviewed · derived

footing.cgWorldZ

C3; perimeter column bay chain; 3; (-6′0″); square footprint around concrete pilaster

Numeric value unresolved

Nominal footing envelope only; source audit state: blocked-by-missing-offset. Column control is −78′7″; footing center remains null.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C3; perimeter column bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: 3; (-6′0″); square footprint around concrete pilaster

Calculated from: column-3-registered-world-z, footing-3-placement-offset-z

foundation-main-5-padverified · derived

footing.cgWorldZ

C5; perimeter column bay chain; ℄ FOOTING; ℄ STEEL COLS; separate labeled centerlines continuing through C5; C5; C6; C7; c; c = 2¾″; OF FOOTINGS FROM ℄ OF MAIN COLUMN ARE GIVEN BY DIMENSION E AND SUFFIX AT TOP OF SCHEDULE.

-78.8125 ft

Nominal footing envelope only; source audit state: checked-arithmetic-from-source-linked-parents.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C5; perimeter column bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: ℄ FOOTING; ℄ STEEL COLS; separate labeled centerlines continuing through C5

IMG_1323 · sheet-W409 · Locate on drawing ↗

Drawing notation: c = 2¾″; OF FOOTINGS FROM ℄ OF MAIN COLUMN ARE GIVEN BY DIMENSION E AND SUFFIX AT TOP OF SCHEDULE.

Calculated from: column-5-registered-world-z, footing-5-placement-offset-z

foundation-main-5-padverified · derived

envelope.minZ

C5; perimeter column bay chain; 5; 10′0″ × 17′0″ × 3′2″; cap 6′0″ × 10′9″ × 2′3[?]″; ℄ FOOTING; ℄ STEEL COLS; separate labeled centerlines continuing through C5; c = 2¾″; OF FOOTINGS FROM ℄ OF MAIN COLUMN ARE GIVEN BY DIMENSION E AND SUFFIX AT TOP OF SCHEDULE.

-87.3125 ft

Nominal footing envelope only; source audit state: checked-arithmetic-from-source-linked-parents.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C5; perimeter column bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: 5; 10′0″ × 17′0″ × 3′2″; cap 6′0″ × 10′9″ × 2′3[?]″

IMG_1328 · Locate on drawing ↗

Drawing notation: ℄ FOOTING; ℄ STEEL COLS; separate labeled centerlines continuing through C5

IMG_1323 · sheet-W409 · Locate on drawing ↗

Drawing notation: c = 2¾″; OF FOOTINGS FROM ℄ OF MAIN COLUMN ARE GIVEN BY DIMENSION E AND SUFFIX AT TOP OF SCHEDULE.

Calculated from: footing-5-placement-center-z, footing-5-placement-span-z

foundation-main-5-padverified · derived

envelope.maxZ

C5; perimeter column bay chain; 5; 10′0″ × 17′0″ × 3′2″; cap 6′0″ × 10′9″ × 2′3[?]″; ℄ FOOTING; ℄ STEEL COLS; separate labeled centerlines continuing through C5; c = 2¾″; OF FOOTINGS FROM ℄ OF MAIN COLUMN ARE GIVEN BY DIMENSION E AND SUFFIX AT TOP OF SCHEDULE.

-70.3125 ft

Nominal footing envelope only; source audit state: checked-arithmetic-from-source-linked-parents.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: C5; perimeter column bay chain

IMG_1328 · Locate on drawing ↗

Drawing notation: 5; 10′0″ × 17′0″ × 3′2″; cap 6′0″ × 10′9″ × 2′3[?]″

IMG_1328 · Locate on drawing ↗

Drawing notation: ℄ FOOTING; ℄ STEEL COLS; separate labeled centerlines continuing through C5

IMG_1323 · sheet-W409 · Locate on drawing ↗

Drawing notation: c = 2¾″; OF FOOTINGS FROM ℄ OF MAIN COLUMN ARE GIVEN BY DIMENSION E AND SUFFIX AT TOP OF SCHEDULE.

Calculated from: footing-5-placement-center-z, footing-5-placement-span-z

column-8verified · derived

world X

printed perimeter column bay chain

21 ft

Drawing elevation where applicable. verified-column-control; no finite C8/C9 strip or C12 placed pad is accepted.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: printed perimeter column bay chain

Source-gated footings-8-9-12-placement-gate;

column-8verified · derived

world Z

south/Madison outer-column line

-78.583333 ft

Drawing elevation where applicable. verified-column-control; no finite C8/C9 strip or C12 placed pad is accepted.

IMG_1314 · sheet-W400 · Locate on drawing ↗

Drawing notation: south/Madison outer-column line

Source-gated footings-8-9-12-placement-gate;

View all source photographs →