Gus J. SolomonUnited States Courthouse
← Back to the building1933 reconstruction · research preview

The measured building.

Every dimension belongs to an object and a drawing. Original room numbers, object marks, printed values and source regions stay together—even when the answer is unresolved.

Source photographs
464
Identified objects
4872
Verified printed values
12046
Disputed values
20

464 of 464 photographs have extraction records, containing 27,517 properties. Initial image review is not exhaustive extraction: 0 photographs have passed the full-region check. 66 numbered sheets are reconciled. Modeling and architectural registration are separate work; these counts do not establish a complete building.

Download the structured register (JSON)

Open the coordinated research model →

Clear filters
IMG_1204 · Folder 190

FIRST FLOOR PLAN

Sheet W3

Extraction: Reviewed · extraction partial. First-floor public-lobby plan, reported 18'-3" ceiling-height reading and repeated 14'/15' structural dimensions. Normalized from an existing text re-audit; this import did not reopen the source image. W214 P5/P6 ceiling-panel/light installation gate; physical fixture position unresolved. Partial timed visual review: Additive bounded follow-up; coordinates normalized to unrotated access raster. Original plan/topology records retained. No model acceptance or complete-sheet claim. Partial timed visual review: Bounded text-first follow-up; ten sequential inspections total across nine derivatives including one W-6 same-source core crop. No accepted physical geometry. Existing verified readings omitted. IMG_1209 uses prior closeout text only. Partial timed visual review: Upright access schedule and surrounding bay context reviewed; no installed quantity inference. Partial timed visual review: undefined Partial timed visual review: Source-local partial review; no physical coordinates accepted. Partial timed visual review: undefined

Highlighted reading: METAL ACCESS DOOR TO STORAGE SPACE OVER / SEE SH.A232. Separate access to storage over Stamps vault; does not certify an ordinary full-height door into the vault or storage elevation.

Show every recorded property on this drawing →

Unresolved extraction work
  • Complete drawing-note transcription
  • Every dimension and bay placement
  • Detailed hardware/fastener schedule
  • Exact cross-sheet bay correspondence
  • Cross-photo physical deduplication
  • Complete surviving-object inventory
  • Exact dimensions
  • Construction/alteration chronology
  • Condition assessment
  • P-6 component extraction
  • Installed fixture schedule and positions
  • As-built correspondence
  • Fixture finish and glass color
  • installed fixture instance/count and W214-panel-to-WLF-246 type correspondence
  • dimensioned A/B ceiling-grid station from a classified W3 or W214 plan control in X
  • dimensioned lobby centerline and panel-row station in Z
  • accepted W214 ceiling-grid to W3 transform with a held-out check
  • actual suspension/ceiling anchor within the panel rather than merely somewhere below it
  • resolved public-lobby height and finished coffer/anchor Y surface
  • P-5 overall diameter and canopy-to-bottom drop, or independently dimensioned P-6 envelope
  • fixture orientation and clearance to beams, cornice, openings and occupied space
  • Every remaining dimension, schedule, callout and companion detail needs region review; no accepted physical/world geometry.
  • Source-local applicability, construction thicknesses, complete object inventory and as-built correspondence remain unresolved.
  • All unreviewed local dimensions, exact faces/jambs, room applicability, schedules and companion details remain pending; no full-image extraction claim.
  • Exact box/drop type-to-bay assignment and endpoints
  • Full schedule companion details
  • Remaining plan dimensions and full region coverage
  • Exact installed quantities and type-to-instance assignment
  • Rough/finished/structural endpoint classes, complete host outline and source-to-building registration
  • Governing original/revision and companion-detail authority; no accepted physical geometry
  • All uninspected source regions, notes, schedules and companion details; whole source remains partial
  • Accepted finish/rough/structural endpoint classes and source-to-building transform absent
  • All physical construction layers, exact material limits, installed quantities and as-built correspondence unresolved
  • Remaining fine chains, schedules, callouts, revisions and companion details require review; exhaustive extraction not certified
  • Classified finish/rough/structural faces, closed boundaries and source-to-building registration
  • Original/revision authority, companion details and as-built correspondence
  • All unreviewed regions, notes, schedules and callouts; no whole-source completeness

Download OCR observations (unverified)

Loading the selected drawing…

Scroll or pinch to inspect this drawing. The gold outline locates the selected reading. Archival drawing photograph · Oregon Historical Society research collections.

Open source image separately ↗

1 matching properties

Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.

f1-vault-stampsverified · printed

Storage-over-vault access distinction

METAL ACCESS DOOR TO STORAGE SPACE OVER / SEE SH.A232

Separate access to storage over Stamps vault; does not certify an ordinary full-height door into the vault or storage elevation.

IMG_1204 · W-3 · Locate on drawing ↗

Drawing notation: METAL ACCESS DOOR TO STORAGE SPACE OVER / SEE SH.A232

Separate access to storage over Stamps vault; does not certify an ordinary full-height door into the vault or storage elevation.

View all source photographs →