IMG_1155 · Folder 191Post Office Inspectors Toilet Room - 223
Original sheet identity has not yet been reconciled.
Extraction: Reviewed · extraction partial. Partial timed visual review: Partial text-first then sequential <=1000px JPEG65 locator review of public/archive/drawings/complete-upright/IMG_1155.webp. Selected legible regions only, not full extraction. Coordinates normalized to unrotated access image; actual principal text upright. No modeling authorized. Partial timed visual review: Additive bounded remaining-region review of upright WebP after queue, OCR and prior packages; no geometry acceptance. Partial timed visual review: Additive source-local detail followup; existing verified readings retained. Sequential upright WebP review or explicit text-summary reuse; no modeling acceptance. Partial timed visual review: Verified sanitary shower-seat and frame materials reused; no new source inspection Partial timed visual review: Additive finish/fixture note review after prior records; fine detail limited by access derivative resolution; no geometry acceptance. Partial timed visual review: Selected source-local properties; source remains incomplete. Partial timed visual review: Raw master is upright despite EXIF3. Corrected bounded swing elevation crop provides independent type-component dimensions.
Highlighted reading: SEVENTH FLOOR TOILET ROOMS 720-721. Selected source evidence only; partial locator review. Applies only to depicted assembly.
Show every recorded property on this drawing →
Unresolved extraction work
- locator review only; full region coverage, dimension chains and fine fractions remain outstanding
- remaining schedules, notes, quantities, materials and companion details
- historical instance registration, revision/annotation reconciliation and finish sample identity
- Fine fractional dimensions and classified extension endpoints in remaining regions
- Complete individual component inventory and companion-sheet/revision reconciliation
- Accepted source-to-building transform and actual installed geometry
- Remaining fine dimension fractions and endpoints require higher-resolution region evidence
- Fixture/partition instance mapping, governing schedules and companion details
- Accepted source-to-building registration and physical geometry remain withheld
- Remaining regions, fine fractions and extension endpoints need review
- Installed instance mapping and accepted source-to-building transform
- Companion details and revision reconciliation
- No additional source regions visually reviewed in this bounded package
- Remaining dimensions, fractions, endpoint classification and revision reconciliation
- Installed instance mapping and governing finish schedules
- Accepted source-to-building transform and full region extraction remain outstanding
- Swing-room shower hardware, full Room223 dimension chain and generic private-toilet applicability unresolved.
- Installed instances, full component dimensions and hardware specifications remain unresolved.
- Governing revisions, companion details and source-to-building registration remain unresolved.
- No geometry acceptance or architectural release; all unreviewed source regions remain open.
- Governing sanitary fixture key/specification, manufacturer, fixture-body material and finish remain unestablished.
- All unvisited notes, schedules, dimensions, callouts, revision marks and companion regions still require review.
- Accepted architectural faces, source-to-building registration, fixture offsets, installed state and whole-building checks remain outstanding.
Download OCR observations (unverified)