The measured building.

Every dimension belongs to an object and a drawing. Original room numbers, object marks, printed values and source regions stay together—even when the answer is unresolved.

Source photographs
464
Identified objects
4872
Verified printed values
12046
Disputed values
20

464 of 464 photographs have extraction records, containing 27,517 properties. Initial image review is not exhaustive extraction: 0 photographs have passed the full-region check. 66 numbered sheets are reconciled. Modeling and architectural registration are separate work; these counts do not establish a complete building.

Download the structured register (JSON)

Open the coordinated research model →

Clear filters
IMG_1118 · Folder 191

Details of Stair E — Upper Stories

Sheet W226

Extraction: Reviewed · extraction partial. Text-first review followed by one complete source photograph and sequential crops from the same photograph. Reviewed the sheet identity, Section A-A, eighth-, seventh-, typical second-through-sixth-, first- and basement-floor plans, printed riser counts, regional floor elevations, the printed second-floor-only dotted-line exception, and major material/finish callouts. Companion/close-up photographs IMG_1119 and IMG_1120 were identified but not opened. Reused the verified W226 Stair E upper-story extraction and one targeted typical-plan crop to test the printed run, ten-riser-per-flight numbering, second-floor-only dotted-line exception and regional sixth/seventh/eighth-floor datums against registered plan envelopes. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Partial timed visual review: OCR, queue and existing extraction packages searched first. One sequential upright WebP inspection; only additive selected properties recorded. Previously verified readings reused without duplication. No complete extraction or accepted geometry. Partial timed visual review: Text/OCR, review-queue and prior-package audit; prior verified readings reused without duplication. No accepted geometry or building connections. Partial timed visual review: Text reuse only: prior verified evidence retained without duplication; no new visual review or completeness claim. Partial timed visual review: Selected construction and reference-face review only; source evidence does not authorize physical geometry. Partial timed visual review: undefined Partial timed visual review: Text reuse only. Accepted W226-to-building transform requires checked non-collinear registration and held-out residuals; glyph inspection cannot close it. UP20/DOWN22 and regional datum conflicts remain open. Partial timed visual review: Text-only canonical/queue/OCR reuse; no new image inspection. Partial timed visual review: undefined Partial timed visual review: undefined

Highlighted reading: SEE ALSO DRAWING NO. 228. One complete source and sequential crops from the same photograph were inspected. Pixel distances were not used as architectural dimensions.

Show every recorded property on this drawing →

Unresolved extraction work
  • Accepted W226-to-building X/Z transform
  • Resolution of the 20-up versus 22-down printed count between the sixth and seventh floors
  • Reconciliation of the W226 seventh-floor elevation 173.25 with the 171.75 exterior and 173.75 schedule/Madison controls
  • Exhaustive transcription of every small dimension and note
  • Exact rough and finish wall faces
  • Flight widths, complete run dimensions, nosings and stringer construction
  • Exact landing polygons, slab openings and headroom
  • Railing member profiles, connections and terminations
  • Plan-condition variations called out for the passage and selected floors
  • Independent overlay and residual checks against the floor plans
  • Accepted W226-to-building transform
  • Exact wall and opening faces
  • Exact landing polygons
  • Sixth-to-seventh two-riser landing applicability
  • Physical tread, riser, stringer, rail and soffit construction
  • On W226 close-up IMG_1119 or IMG_1120, transcribe the full typical-plan dimension chain and classify flight, landing, rough-wall and finish-wall endpoints. On registered W6/IMG_1212 and W7/IMG_1213, repick the same physical edge classes and closed floor-opening contours at Stair E; solve the W226 plan-to-canonical transform from non-collinear correspondences and check held-out edges and the adjacent-floor join before authoring one fourth-to-fifth-floor segment.
  • Complete fine dimension chains and classified rough/finish endpoints
  • Member profiles, fasteners, fabrication details and material-code reconciliation
  • Historical instance and floor-plan registration
  • Companion details, revision authority and independent physical connection checks
  • W226 20-up / 22-down and 173.25 /171.75 /173.75 datum conflicts remain unresolved.
  • Complete fine dimension chains and endpoint classification
  • W228 construction and material-code reconciliation
  • Exact rail/gate profiles, fasteners and opening geometry
  • Independent modeling and connection checks
  • Source-to-building registration, landing polygons, slab openings and installed instances
  • Companion detail/revision authority and independent physical checks
  • Accepted rail-to-rail clear width, closed landing/slab-opening boundaries and headroom
  • Complete material/gauge/fastener schedules, cap/moulding profiles and finish extents; remaining notes and revisions not fully reviewed
  • Checked source-to-building transforms, storey/installed instance applicability and independent physical checks
  • W226 UP20/DOWN22 and datum conflicts remain separate; accepted building transform needs checked corresponding controls.
  • Complete fine profiles, member sizes, fasteners, finish extents and endpoint classes remain partial.
  • Installed quantities, stair/storey/room assignment, closed openings, headroom, source-to-building registration and independent physical checks remain unresolved.
  • Governing original/revision and companion applicability remain unresolved; source reading does not approve geometry.
  • Text reuse only. Accepted W226-to-building transform requires checked non-collinear registration and held-out residuals; glyph inspection cannot close it. UP20/DOWN22 and regional datum conflicts remain open.
  • Complete fine dimension chains, rail/string/nosing profiles, fastener/gauge/material schedules and exact finish/rough endpoint classes remain partial.
  • Installed instance/storey assignment, source-to-building registration, closed slab openings, headroom and independent physical checks remain outstanding.
  • Companion W228 details and governing revision/installation applicability remain unresolved; source extraction does not approve model geometry.
  • Complete cap/moulding/handrail/string/nosing profiles, materials, gauges, fastener sizes and exact endpoint classes remain partial.
  • Printed type/floor applicability does not establish installed quantities, storey assignment, source-to-building transforms or accepted physical geometry.
  • Full region, companion exposure, revision authority and independent installation/profile/height registration remain outstanding; no irrecoverable gap is asserted.
  • W226 UP20/DOWN22 and regional173.25/171.75/173.75 conflicts remain separate and unresolved.
  • Remaining cap/moulding/handrail/string/nosing fractions, gauges, fastener material/size/anchorage, finish extents and source endpoint classes.
  • Installed storey/room quantities, closed openings and landing boundaries, rail clear width, headroom, source-to-building transforms and independent physical checks.
  • Companion/revision authority remains open; no source or floor completeness or irrecoverable gap asserted.
  • Complete member/profile dimensions, material/gauge/fastener schedules and exact endpoint classes
  • Installed stair/storey/room allocation, quantities, original/revision authority and companion applicability
  • Source-to-building registration, complete landing/shaft openings, independent physical checks and architectural acceptance

Download OCR observations (unverified)

Loading the selected drawing…

Scroll or pinch to inspect this drawing. The gold outline locates the selected reading. Archival drawing photograph · Oregon Historical Society research collections.

Open source image separately ↗

21 matching objects

An identified object is not a fully modeled object. Missing dimensions, locations and relationships remain explicit.

assembly · stair-e-w226-upper-stories-registerModeling: not-modeled

Stair E · W226 upper-stories register

Research representation: none. Architectural checks: pending.

Basement · First floor · Second floor · Third floor · Fourth floor · Fifth floor · Sixth floor · Seventh floor · Eighth floor · Original mark: E / W226

Architectural-detail register only. Existing floor-plan Stair E traces identify the building core, but W226 has no accepted metric transform to those traces.

8 recorded properties

Still to extract or check
  • Accepted building transform
  • Physical flight geometry
  • Exact stair openings
  • Complete dimensions
  • Headroom
  • Support connections
  • Sixth-to-seventh riser-count conflict
Inspect this object’s readings →

View source IMG_1118 ↗

section · stair-e-w226-section-aaModeling: not-modeled

Stair E · W226 longitudinal Section A-A

Research representation: none. Architectural checks: pending.

Second floor · Third floor · Fourth floor · Fifth floor · Sixth floor · Seventh floor · Eighth floor · Original mark: A-A

Source-local section establishing storey relationships and regional floor elevations; no building X/Z transform is accepted.

Source relationships · not a verified physical connection

5 recorded properties

Still to extract or check
  • Exhaustive dimension transcription
  • Building transform
  • Riser-count conflict
  • Construction thicknesses
  • Regional landing boundaries
Inspect this object’s readings →

View source IMG_1118 ↗

plan · stair-e-w226-plan-typical-2-6Modeling: not-modeled

Stair E · second-through-sixth floor plan condition

Research representation: none. Architectural checks: pending.

Second floor · Third floor · Fourth floor · Fifth floor · Sixth floor

Source-local plan captioned for floors 2 through 6; a passage note directs selected conditions to full-scale drawings.

Source relationships · not a verified physical connection

4 recorded properties

Still to extract or check
  • Exact geometry represented by the second-floor-only dotted lines
  • Other floor-specific exceptions
  • Accepted plan transform
  • Exact wall faces
  • Landing polygon
  • Slab opening
  • Sixth-to-seventh count conflict
Inspect this object’s readings →

View source IMG_1118 ↗

plan · stair-e-w226-plan-seventhModeling: not-modeled

Stair E · seventh-floor plan condition

Research representation: none. Architectural checks: pending.

Seventh floor

Source-local seventh-floor plan with separately printed down/up riser counts.

Source relationships · not a verified physical connection

2 recorded properties

Still to extract or check
  • Accepted plan transform
  • Exact wall faces
  • Landing polygon
  • Slab opening
  • Down-flight conflict with sixth-floor plan
Inspect this object’s readings →

View source IMG_1118 ↗

plan · stair-e-w226-plan-eighthModeling: not-modeled

Stair E · eighth-floor terminal plan

Research representation: none. Architectural checks: pending.

Eighth floor

Source-local eighth-floor plan and terminal landing condition.

Source relationships · not a verified physical connection

0 recorded properties

Still to extract or check
  • Accepted plan transform
  • Exact terminal landing
  • Roof/ventilator interfaces
  • Wall faces
Inspect this object’s readings →

View source IMG_1118 ↗

plan · stair-e-w226-plan-firstModeling: not-modeled

Stair E · first-floor plan condition

Research representation: none. Architectural checks: pending.

First floor

Source-local first-floor plan showing the basement down-flight and the first-to-second stair count.

Source relationships · not a verified physical connection

3 recorded properties

Still to extract or check
  • Intermediate landing decomposition of the 36-riser rise
  • Accepted plan transform
  • Wall faces
  • Openings
Inspect this object’s readings →

View source IMG_1118 ↗

plan · stair-e-w226-plan-basementModeling: not-modeled

Stair E · basement plan condition

Research representation: none. Architectural checks: pending.

Basement

Source-local basement plan showing a two-run up stair numbered through 22 risers.

Source relationships · not a verified physical connection

1 recorded properties

Still to extract or check
  • Accepted basement datum
  • Accepted plan transform
  • Exact run/landing dimensions
  • Wall faces
  • Openings
Inspect this object’s readings →

View source IMG_1118 ↗

assembly · stair-e-w226-metal-landing-systemModeling: not-modeled

Stair E metal landing system

Research representation: none. Architectural checks: pending.

Second floor · Third floor · Fourth floor · Fifth floor · Sixth floor · Seventh floor · Eighth floor

Repeated intermediate landing condition called out in Section A-A and the floor plans.

Source relationships · not a verified physical connection

1 recorded properties

Still to extract or check
  • Plate/member sizes
  • Supports
  • Connections
  • Exact plan dimensions
  • Storey exceptions
  • Building placement
Inspect this object’s readings →

View source IMG_1118 ↗

fitting · stair-e-w226-metal-railing-systemModeling: not-modeled

Stair E upper-story metal railing system

Research representation: none. Architectural checks: pending.

Second floor · Third floor · Fourth floor · Fifth floor · Sixth floor · Seventh floor · Eighth floor

Repeated metal railing callouts in Section A-A; W228 is required for typical construction details.

Source relationships · not a verified physical connection

1 recorded properties

Still to extract or check
  • Member sizes
  • Post spacing
  • Handrail height/profile
  • Connections
  • Terminations
  • Building placement
Inspect this object’s readings →

View source IMG_1118 ↗

assembly · stair-e-w226-metal-treads-risersModeling: not-modeled

Stair E metal treads and risers

Research representation: none. Architectural checks: pending.

Second floor · Third floor · Fourth floor · Fifth floor · Sixth floor · Seventh floor · Eighth floor

Section A-A calls out metal treads and risers; exact profiles remain a W228 dependency.

Source relationships · not a verified physical connection

1 recorded properties

Still to extract or check
  • Tread going
  • Riser height
  • Nosing/profile
  • Stringer/interface
  • Connections
  • Building placement
Inspect this object’s readings →

View source IMG_1118 ↗

finish · stair-e-w226-terrazzo-floor-finishModeling: not-modeled

Stair E terrazzo floor finish at upper-story landings

Research representation: none. Architectural checks: pending.

Second floor · Third floor · Fourth floor · Fifth floor · Sixth floor · Seventh floor

Terrazzo floor is called out along the upper-story landing/floor lines in Section A-A.

Source relationships · not a verified physical connection

1 recorded properties

Still to extract or check
  • Thickness
  • Setting bed
  • Borders/joints
  • Exact extents
  • Building placement
Inspect this object’s readings →

View source IMG_1118 ↗

finish · stair-e-w226-plastered-wall-systemModeling: not-modeled

Stair E upper-story plastered walls and soffit

Research representation: none. Architectural checks: pending.

Second floor · Third floor · Fourth floor · Fifth floor · Sixth floor · Seventh floor · Eighth floor

Repeated PLASTERED WALLS and SOFFIT PLASTERED callouts in Section A-A.

Source relationships · not a verified physical connection

1 recorded properties

Still to extract or check
  • Thickness
  • Substrate
  • Exact extents
  • Edges/joints
  • Building placement
Inspect this object’s readings →

View source IMG_1118 ↗

assembly · stair-e-upper-diagnostic-envelopeModeling: not-modeled

Stair E upper-story median diagnostic envelope

Research representation: none. Architectural checks: pending.

Second floor · Third floor · Fourth floor · Fifth floor · Sixth floor · Seventh floor · Eighth floor · Original mark: E

Median of the level-2, level-3, level-5, level-6 and level-7 provisional Stair E plan-envelope extents. Level 4 is excluded because its MEP-underlay trace has 5-foot uncertainty; level 1 and level 8 are terminal/special envelopes rather than the repeated upper-story condition.

Source relationships · not a verified physical connection

10 recorded properties

Still to extract or check
  • Accepted building transform
  • Exact enclosure faces
  • Exact floor openings
  • Floor-specific exceptions
  • Landing construction
  • Headroom
  • Physical wall, stair and railing geometry
Inspect this object’s readings →

View source IMG_1207 ↗

stair · f2-f3-stair-e-upper-diagnostic-placementModeling: analytical-preview

Stair E level 2 to 3 diagnostic

Research representation: provisional surface. Architectural checks: pending.

Second floor · Third floor · Original mark: E

Two ten-riser switchback flights fitted analytically inside the median upper-story envelope.

Source relationships · not a verified physical connection

0 recorded properties

Still to extract or check
  • Accepted placement
  • Exact clear width
  • Landing dimensions
  • Second-floor dotted-line exception geometry
  • Tread/riser profiles
  • Stringers
  • Rails
  • Headroom
  • Slab openings
Inspect this object’s readings →

View source IMG_1118 ↗

stair · f3-f4-stair-e-upper-diagnostic-placementModeling: analytical-preview

Stair E level 3 to 4 diagnostic

Research representation: provisional surface. Architectural checks: pending.

Third floor · Fourth floor · Original mark: E

Two ten-riser switchback flights fitted analytically inside the median upper-story envelope.

Source relationships · not a verified physical connection

0 recorded properties

Still to extract or check
  • Accepted placement
  • Exact clear width
  • Landing dimensions
  • Tread/riser profiles
  • Stringers
  • Rails
  • Headroom
  • Slab openings
Inspect this object’s readings →

View source IMG_1118 ↗

stair · f4-f5-stair-e-upper-diagnostic-placementModeling: analytical-preview

Stair E level 4 to 5 diagnostic

Research representation: provisional surface. Architectural checks: pending.

Fourth floor · Fifth floor · Original mark: E

Two ten-riser switchback flights fitted analytically inside the median upper-story envelope.

Source relationships · not a verified physical connection

0 recorded properties

Still to extract or check
  • Accepted placement
  • Exact clear width
  • Landing dimensions
  • Tread/riser profiles
  • Stringers
  • Rails
  • Headroom
  • Slab openings
Inspect this object’s readings →

View source IMG_1118 ↗

stair · f5-f6-stair-e-upper-diagnostic-placementModeling: analytical-preview

Stair E level 5 to 6 diagnostic

Research representation: provisional surface. Architectural checks: pending.

Fifth floor · Sixth floor · Original mark: E

Two ten-riser switchback flights fitted analytically inside the median upper-story envelope.

Source relationships · not a verified physical connection

0 recorded properties

Still to extract or check
  • Accepted placement
  • Exact clear width
  • Landing dimensions
  • Tread/riser profiles
  • Stringers
  • Rails
  • Headroom
  • Slab openings
Inspect this object’s readings →

View source IMG_1118 ↗

stair · f6-f7-stair-e-upper-diagnostic-placementModeling: analytical-preview

Stair E level 6 to regional level 7 diagnostic

Research representation: provisional surface. Architectural checks: pending.

Sixth floor · Seventh floor · Original mark: E

Candidate diagnostic with twenty ordinary flight risers plus the W228 two-riser landing condition, reaching W226's regional seventh-floor datum at local 80 feet.

Source relationships · not a verified physical connection

3 recorded properties

Still to extract or check
  • Accepted placement
  • Proof that W228 two-riser condition applies here
  • Exact clear width
  • Landing dimensions
  • Tread/riser profiles
  • Stringers
  • Rails
  • Headroom
  • Slab openings
  • Transition to the generic level-7 floor plane
Inspect this object’s readings →

View source IMG_1118 ↗

stair · f7-f8-stair-e-upper-diagnostic-placementModeling: analytical-preview

Stair E regional level 7 to level 8 diagnostic

Research representation: provisional surface. Architectural checks: pending.

Seventh floor · Eighth floor · Original mark: E

Two ten-riser switchback flights from W226's regional seventh-floor datum at local 80 feet to the eighth floor at local 92 feet.

Source relationships · not a verified physical connection

2 recorded properties

Still to extract or check
  • Accepted placement
  • Exact clear width
  • Landing dimensions
  • Tread/riser profiles
  • Stringers
  • Rails
  • Headroom
  • Slab openings
  • Transition from the generic level-7 floor plane
Inspect this object’s readings →

View source IMG_1118 ↗

assembly · f4-f5-stair-e-physical-flight-candidateModeling: not-modeled

f4 f5 stair e physical flight candidate

Research representation: none. Architectural checks: pending.

Fourth floor · Fifth floor · Original mark: STAIR E

8 recorded properties

Still to extract or check
  • two finite, measured flight widths and edge classes
  • exact local run endpoints and nosing/profile
  • accepted W226-to-building X/Z transform with held-out checks
  • physical tread/riser/stringer thicknesses and connections
  • headroom and flight-to-landing joins
Inspect this object’s readings →

View source IMG_1118 ↗

assembly · f4-f5-stair-e-physical-intermediate-landing-candidateModeling: not-modeled

f4 f5 stair e physical intermediate landing candidate

Research representation: none. Architectural checks: pending.

Fourth floor · Fifth floor · Original mark: METAL LANDING

1 recorded properties

Still to extract or check
  • closed landing polygon and dimension chain
  • finished top elevation and construction thickness
  • wall-string and support connections
  • accepted X/Z placement and joined flight boundaries
Inspect this object’s readings →

View source IMG_1118 ↗