The measured building.

Every dimension belongs to an object and a drawing. Original room numbers, object marks, printed values and source regions stay together—even when the answer is unresolved.

Source photographs
464
Identified objects
4872
Verified printed values
12046
Disputed values
20

464 of 464 photographs have extraction records, containing 27,517 properties. Initial image review is not exhaustive extraction: 0 photographs have passed the full-region check. 66 numbered sheets are reconciled. Modeling and architectural registration are separate work; these counts do not establish a complete building.

Download the structured register (JSON)

Open the coordinated research model →

Clear filters
IMG_1095 · Folder 191

SCREEN DETAILS IN LOBBY — DOORS & END WALLS

Sheet W217

Extraction: Reviewed · extraction partial. Bounded W217 confirmation: Full-sheet title block, Bay P elevator elevation, and the plan note directly below that elevation. Partial entrance-registration review: W217 supplies the separately registered 3-foot-6-inch finished width and 6-foot-9.75-inch finished-floor-to-head height for Elevator No. 1. Bay P directory, paired door, Elevator No. 2 entrance, clock and other glazed door/screen bays. Normalized from an existing text re-audit; this import did not reopen the source image. Partial W217 review: Bay P elevation identity, complete Bay P plan chain and central paired-door plan station. Elevator-front bounded gate: Bay P Elevator 2 plan station, finished entrance segment, and Elevator 1 similar applicability. W3 Main foyer/public lobby screen physical-polygon gate; source group review remains partial. W3 Main foyer/public lobby screen physical-polygon gate; source group review remains partial. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. W217/W218 T/U/V screen vertical/depth gate; targeted regions only. Main/foyer-lobby Bay U screen physical-segment gate; no finite solid authorized. Main/foyer-lobby Bay U screen physical-segment gate; no finite solid authorized. Main/foyer-lobby Bay U screen physical-segment gate; no finite solid authorized. Partial timed visual review: Source-local drawing evidence only; installed quantity, accepted world placement and physical geometry not established. Partial timed visual review: W217 elevator plan and E-E source-local construction notes; no accepted depth or world placement. Partial timed visual review: undefined

Unresolved extraction work
  • Operating clear width and height after door travel
  • Rough opening width and height
  • Sill, threshold and head sections/build-up
  • Individual leaf widths, thicknesses, overlap and travel
  • Outer ornamental-surround dimensions
  • Wall-face assignment and wall thickness
  • Registered world position and orientation
  • Accepted physical host-wall face and thickness
  • Exact entrance depth relative to the W229 clear-hatch edge
  • Rough opening and operating clear width/height
  • Jamb, reveal, frame, sill, threshold and door-leaf construction
  • Complete shaft, cab, guide, pit, overhead and machinery transforms
  • Independent as-built check
  • Complete drawing-note transcription
  • Every dimension and bay placement
  • Detailed hardware/fastener schedule
  • Exact cross-sheet bay correspondence
  • Cross-photo physical deduplication
  • Complete surviving-object inventory
  • Exact dimensions
  • Construction/alteration chronology
  • Condition assessment
  • P-6 component extraction
  • Installed fixture schedule and positions
  • As-built correspondence
  • Fixture finish and glass color
  • All remaining sheet regions and details
  • Accepted physical wall face and wall thickness
  • Rough opening and operating clear dimensions
  • Frame, stile, rail, muntin and trim profiles
  • Glazing thickness and edge treatment
  • Push-bar profiles, lengths and elevations
  • Hardware, threshold, swing and anchorage
  • Directory case depth and physical world transform
  • Elevator entrance host-wall thickness, return geometry, rough opening and physical world transform
  • A readable first-floor W217 Section E or applicable companion section with front and back faces and exact profile/depth dimensions for one named component, plus complete width and height endpoints for that same component.
  • Printed or independently checked panel extents before any ornament panels are given physical sizes; retain panel instances without fabricated dimensions until then.
  • Classified first-floor host wall face, thickness and jamb/reveal/sill/head interfaces tied to named W229 or W230 controls and the corresponding W3 wall or Bay P station.
  • An independent corresponding-face or endpoint residual within a stated tolerance for the chosen physical front, preserving conflicts and W3 trace uncertainty separately.
  • segment-by-segment material and face classes
  • accepted W3-to-detail endpoint/face registration with independent held-out check
  • world XZ footprints and depths for each pier/screen segment
  • six finished jamb X limits on each side plus rough openings and reveals
  • door/head and transom limits
  • checked threshold bottom and finished screen/pier top elevations
  • resolution of the lobby ceiling reading conflict and scope
  • securely dimensioned and registered threshold bottom/top
  • door head and upper glazing bottom/top with clear dimension endpoints
  • finished screen/pier top on both room sides
  • front/back finished face assignments and segment-specific transverse depths
  • accepted W3-to-W217/W218 face/endpoint registration with held-out check
  • physical XZ segment and six finished door-gap polygons
  • classified north/south finished face or axis and world Z control
  • segment-by-segment thickness and joins
  • accepted west/east pier or bay-division edge class
  • finished jamb limits on both faces
  • threshold bottom/top and door head in local Y
  • finished upper screen and pier bounds
  • independent held-out metric registration
  • Fine fractions and complete witness endpoints require targeted high-resolution crops
  • Companion captures, material code and revision authority require reconciliation
  • Installed floor/room registration, exact depths and modeling checks outstanding
  • Remaining W217 details, title/material-code fine print and notes
  • Exact component depths and classified section endpoints
  • Revision and companion reconciliation; accepted physical registration
  • Head/sill depth fractions and front/back endpoint classifications remain unreadable; gauge and section association reused.
  • Installed instance mapping, world placement, companion/revision authority and whole-building acceptance remain unresolved.

Download OCR observations (unverified)

Loading the selected drawing…

Scroll or pinch to inspect this drawing. Archival drawing photograph · Oregon Historical Society research collections.

Open source image separately ↗

105 matching properties

Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.

f1-public-lobby-w217-bay-p-end-wall-assemblyverified · printed

Bay P plan chain segment 17 · unclassified transition field

1'-1 1/2"

1.125 ft

Printed W217 PLAN OF BAY P segment. Assignment is bounded to the visible plan/elevation correspondence; unclassified construction remains unclassified.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 1'-1 1/2"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

f1-public-lobby-w217-bay-p-end-wall-assemblyverified · printed

Bay P plan chain segment 18 · unclassified jamb or trim segment

6"

0.5 ft

Printed W217 PLAN OF BAY P segment. Assignment is bounded to the visible plan/elevation correspondence; unclassified construction remains unclassified.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 6"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · printed

Bay P plan chain segment 19 · Elevator No. 2 finished entrance plan width

3'-6"

3.5 ft

Printed W217 PLAN OF BAY P segment. Assignment is bounded to the visible plan/elevation correspondence; unclassified construction remains unclassified.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 3'-6"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

f1-public-lobby-w217-bay-p-end-wall-assemblyverified · printed

Bay P plan chain segment 20 · unclassified jamb or trim segment

6"

0.5 ft

Printed W217 PLAN OF BAY P segment. Assignment is bounded to the visible plan/elevation correspondence; unclassified construction remains unclassified.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 6"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

f1-public-lobby-w217-bay-p-end-wall-assemblyverified · printed

Bay P plan chain segment 21 · unclassified terminal field

1'-1 1/2"

1.125 ft

Printed W217 PLAN OF BAY P segment. Assignment is bounded to the visible plan/elevation correspondence; unclassified construction remains unclassified.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 1'-1 1/2"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

f1-public-lobby-w217-bay-p-end-wall-assemblyverified · printed

Bay P plan chain segment 22 · unclassified end return

2"

0.166667 ft

Printed W217 PLAN OF BAY P segment. Assignment is bounded to the visible plan/elevation correspondence; unclassified construction remains unclassified.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 2"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

f1-public-lobby-w217-bay-p-end-wall-assemblyverified · derived

Calculated sum of all 22 printed plan-chain segments

24'-11" (exact chain closure)

24.916667 ft

Arithmetic checksum only; equality does not establish as-built survey precision.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 24'-11"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

Calculated from: W217-bay-p-plan-chain-01-south-directory-end-return, W217-bay-p-plan-chain-02-south-directory-terminal-field, W217-bay-p-plan-chain-03-south-directory-jamb, W217-bay-p-plan-chain-04-directory-case-width, W217-bay-p-plan-chain-05-directory-inner-jamb, W217-bay-p-plan-chain-06-directory-transition-field, W217-bay-p-plan-chain-07-directory-to-door-field, W217-bay-p-plan-chain-08-door-left-outer-trim, W217-bay-p-plan-chain-09-door-left-inner-trim, W217-bay-p-plan-chain-10-door-left-ornament, W217-bay-p-plan-chain-11-door-left-leaf, W217-bay-p-plan-chain-12-door-right-leaf, W217-bay-p-plan-chain-13-door-right-ornament, W217-bay-p-plan-chain-14-door-right-inner-trim, W217-bay-p-plan-chain-15-door-right-outer-trim, W217-bay-p-plan-chain-16-door-to-elevator-field, W217-bay-p-plan-chain-17-elevator-transition-field, W217-bay-p-plan-chain-18-elevator-inner-jamb, W217-bay-p-plan-chain-19-elevator-finished-entrance-width, W217-bay-p-plan-chain-20-elevator-outer-jamb, W217-bay-p-plan-chain-21-north-elevator-terminal-field, W217-bay-p-plan-chain-22-north-elevator-end-return

f1-public-lobby-w217-bay-p-door-pairverified · derived

Door meeting-line station from source-plan start

12'-5 1/2" (exact midpoint)

12.458333 ft

Source-plan station only; converted to world coordinates by the separate Bay P/W3 analytical registration.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 3'-0" + 3'-0" centered in 24'-11"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

Calculated from: W217-bay-p-plan-chain-01-south-directory-end-return, W217-bay-p-plan-chain-02-south-directory-terminal-field, W217-bay-p-plan-chain-03-south-directory-jamb, W217-bay-p-plan-chain-04-directory-case-width, W217-bay-p-plan-chain-05-directory-inner-jamb, W217-bay-p-plan-chain-06-directory-transition-field, W217-bay-p-plan-chain-07-directory-to-door-field, W217-bay-p-plan-chain-08-door-left-outer-trim, W217-bay-p-plan-chain-09-door-left-inner-trim, W217-bay-p-plan-chain-10-door-left-ornament, W217-bay-p-plan-chain-11-door-left-leaf

f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived

Elevator No. 2 finished-entrance south-edge station from source-plan start

19'-7 1/2"

19.625 ft

Plan station at the finished entrance's first inside jamb face; not a rough opening or wall cut.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 3'-6" ELEVATOR No. 2 entrance

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

Calculated from: W217-bay-p-plan-chain-01-south-directory-end-return, W217-bay-p-plan-chain-02-south-directory-terminal-field, W217-bay-p-plan-chain-03-south-directory-jamb, W217-bay-p-plan-chain-04-directory-case-width, W217-bay-p-plan-chain-05-directory-inner-jamb, W217-bay-p-plan-chain-06-directory-transition-field, W217-bay-p-plan-chain-07-directory-to-door-field, W217-bay-p-plan-chain-08-door-left-outer-trim, W217-bay-p-plan-chain-09-door-left-inner-trim, W217-bay-p-plan-chain-10-door-left-ornament, W217-bay-p-plan-chain-11-door-left-leaf, W217-bay-p-plan-chain-12-door-right-leaf, W217-bay-p-plan-chain-13-door-right-ornament, W217-bay-p-plan-chain-14-door-right-inner-trim, W217-bay-p-plan-chain-15-door-right-outer-trim, W217-bay-p-plan-chain-16-door-to-elevator-field, W217-bay-p-plan-chain-17-elevator-transition-field, W217-bay-p-plan-chain-18-elevator-inner-jamb

f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived

Elevator No. 2 finished-entrance center station from source-plan start

21'-4 1/2"

21.375 ft

Source-plan center station converted to building coordinates by the checked Bay P/W3 registration.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 3'-6" ELEVATOR No. 2 entrance

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

Calculated from: W217-bay-p-plan-chain-01-south-directory-end-return, W217-bay-p-plan-chain-02-south-directory-terminal-field, W217-bay-p-plan-chain-03-south-directory-jamb, W217-bay-p-plan-chain-04-directory-case-width, W217-bay-p-plan-chain-05-directory-inner-jamb, W217-bay-p-plan-chain-06-directory-transition-field, W217-bay-p-plan-chain-07-directory-to-door-field, W217-bay-p-plan-chain-08-door-left-outer-trim, W217-bay-p-plan-chain-09-door-left-inner-trim, W217-bay-p-plan-chain-10-door-left-ornament, W217-bay-p-plan-chain-11-door-left-leaf, W217-bay-p-plan-chain-12-door-right-leaf, W217-bay-p-plan-chain-13-door-right-ornament, W217-bay-p-plan-chain-14-door-right-inner-trim, W217-bay-p-plan-chain-15-door-right-outer-trim, W217-bay-p-plan-chain-16-door-to-elevator-field, W217-bay-p-plan-chain-17-elevator-transition-field, W217-bay-p-plan-chain-18-elevator-inner-jamb, W217-bay-p-plan-chain-19-elevator-finished-entrance-width

f1-public-lobby-w217-bay-p-door-pairverified · derived

Analytical door center · world west/east coordinate

63.6025 ft (W3 midpoint registration)

63.6025 ft

Accepted only for the zero-thickness analytical leaf envelopes; W3 retains 2-foot plan-trace uncertainty.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-public-lobby-w217-bay-p-door-pairverified · derived

Analytical door center · local vertical coordinate

0 ft · first-floor finished-floor datum

0 ft

Project-local vertical coordinate; does not establish threshold construction.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: FIN. FIRST FLOOR

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

Calculated from: frame-first-floor-finish

f1-public-lobby-w217-bay-p-door-pairverified · derived

Analytical door center · world south/north coordinate

41.6895 ft (W3 midpoint registration)

41.6895 ft

Accepted only for the zero-thickness analytical leaf envelopes; W3 retains 2-foot plan-trace uncertainty.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-public-lobby-w217-bay-p-door-pairverified · derived

Analytical door plane rotation about building Y

-1.5873855067559648 rad

-1.587386 rad

Maps W217 source-plan +X toward the W3 north/Elevator No. 2 end; applies only to analytical leaf surfaces.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-public-lobby-w217-bay-p-end-wall-assemblyverified · derived

Centered W217 overall endpoint residual at each W3 Bay P end

1.256343458758947 ft each

1.256343 ft

Both endpoint residuals remain within the recorded 2-foot W3 trace allowance.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 24'-11"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-public-lobby-w217-bay-p-door-pairverified · derived

Held-out W3 traced-door center residual

1.468130699730716 ft

1.468131 ft

Independent center check within the 2-foot W3 trace allowance. The incomplete W3 segment is not used to resize W217.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 3'-0" + 3'-0"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: Double-leaf swing arcs

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-public-lobby-w217-bay-p-door-pairdisputed · derived

Rejected W3 south doorway endpoint residual

2.338295206106527 ft · outside tolerance

2.338295 ft

Outside tolerance and retained as evidence that the W3 swing-arc trace is not a complete jamb-to-jamb opening. It is excluded from placement acceptance.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: 3'-0" + 3'-0"

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: Double-leaf swing arcs

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-public-lobby-w217-bay-p-door-pairverified · derived

Analytical leaf-envelope building placement

Accepted · zero-thickness evidence review only

W217 supplies an exact symmetric 24'-11" Bay P plan, a 6-foot central paired door, and a separately chained 3'-6" Elevator No. 2 finished entrance. Centering that exact plan on the independently labeled W3 Bay P wall leaves 1.256-foot endpoint residuals and a 1.468-foot held-out door-center residual, both within W3's recorded 2-foot trace uncertainty. The W3 door trace is only 3.9 feet wide and its south endpoint fails the 2-foot check, so it is treated as an incomplete swing-arc trace and is not used to resize the verified W217 leaves. A separate old W3 line classified as the Elevator No. 2 threshold is 6.957 feet from the W217-predicted entrance center and differs in orientation by 89.695 degrees; targeted review confirms it is not the Bay P-parallel entrance plane, so that provisional trace is disputed and excluded. The checked registration places the zero-thickness analytical door leaves and Elevator No. 2 finished-entrance envelope only; it does not establish physical wall, frame, shaft, cab, or equipment geometry.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-public-lobby-w217-bay-p-door-pairverified · observed

Physical door/frame/wall-cut placement

Withheld

Physical geometry remains prohibited: Accepted physical wall face and wall thickness; Rough opening and operating clear dimensions; Frame, stile, rail, muntin and trim profiles; Glazing thickness and edge treatment; Push-bar profiles, lengths and elevations; Hardware, threshold, swing and anchorage; Directory case depth and physical world transform; Elevator entrance host-wall thickness, return geometry, rough opening and physical world transform; Independent as-built check.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived

Elevator No. 2 analytical finished-entrance center · world west/east coordinate

63.454586596548396 ft

63.454587 ft

Accepted only for the zero-thickness finished-entrance evidence envelope.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P; ELEVATOR No. 2

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P; ELEVATOR NO. 2

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

Calculated from: W217-bay-p-plan-elevator-entrance-center-station, W217-bay-p-W3-rotation-y

f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived

Elevator No. 2 analytical finished-entrance base · local vertical coordinate

0 ft · first-floor finished-floor datum

0 ft

Envelope base coordinate only; threshold and sill construction remain unresolved.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: FIN. FIRST FLOOR

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

Calculated from: frame-first-floor-finish

f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived

Elevator No. 2 analytical finished-entrance center · world south/north coordinate

50.604939757495075 ft

50.60494 ft

Accepted only for the zero-thickness finished-entrance evidence envelope.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P; ELEVATOR No. 2

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P; ELEVATOR NO. 2

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

Calculated from: W217-bay-p-plan-elevator-entrance-center-station, W217-bay-p-W3-rotation-y

f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived

Elevator No. 2 analytical finished-entrance plane rotation about building Y

-1.5873855067559648 rad

-1.587386 rad

Zero-thickness elevation plane only.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

Calculated from: W217-bay-p-W3-rotation-y

f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · derived

Elevator No. 2 analytical finished-entrance envelope placement

Accepted · zero-thickness evidence review only

W217 supplies an exact symmetric 24'-11" Bay P plan, a 6-foot central paired door, and a separately chained 3'-6" Elevator No. 2 finished entrance. Centering that exact plan on the independently labeled W3 Bay P wall leaves 1.256-foot endpoint residuals and a 1.468-foot held-out door-center residual, both within W3's recorded 2-foot trace uncertainty. The W3 door trace is only 3.9 feet wide and its south endpoint fails the 2-foot check, so it is treated as an incomplete swing-arc trace and is not used to resize the verified W217 leaves. A separate old W3 line classified as the Elevator No. 2 threshold is 6.957 feet from the W217-predicted entrance center and differs in orientation by 89.695 degrees; targeted review confirms it is not the Bay P-parallel entrance plane, so that provisional trace is disputed and excluded. The checked registration places the zero-thickness analytical door leaves and Elevator No. 2 finished-entrance envelope only; it does not establish physical wall, frame, shaft, cab, or equipment geometry.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P; ELEVATOR No. 2

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P; ELEVATOR NO. 2

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-public-lobby-w217-bay-p-elevator-no2-entranceverified · observed

Elevator No. 2 physical entrance/frame/wall-cut placement

Withheld

Host-wall thickness, returns, rough opening, jamb/reveal depth, frame construction, sill, doors, shaft, cab and equipment remain unresolved.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: BAY P

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

f1-door-elevator-2verified · derived

Rejected W3 threshold-trace center residual from registered W217 entrance center

6.95707575710492 ft · rejected

6.957076 ft

The residual exceeds W3's 2-foot trace allowance; the old trace is not averaged or reused.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P; ELEVATOR No. 2

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: Earlier provisional threshold trace

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

Calculated from: W217-bay-p-W3-elevator-entrance-world-center-x, W217-bay-p-W3-elevator-entrance-world-center-z, W217-bay-p-W3-elevator-entrance-rejected-trace-center-x, W217-bay-p-W3-elevator-entrance-rejected-trace-center-z

f1-door-elevator-2verified · derived

Rejected W3 threshold-trace acute orientation difference from registered Bay P plane

89.69515759763117° · nearly perpendicular

89.695158 deg

Targeted source review confirms that the Elevator No. 2 entrance is parallel to Bay P; the nearly perpendicular trace is misclassified.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY P

Full-sheet text and existing reports were read first; the complete sheet and sequential Bay P plan crops were then inspected one image at a time.

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: Earlier provisional threshold trace

The W3 registration is provisional. Bay P wall endpoints and the double-door segment are traced plan controls with a conservative 2-foot uncertainty, not surveyed construction faces.

Calculated from: W217-bay-p-W3-elevator-entrance-rotation-y, f1-door-elevator-2-jamb-1-west, f1-door-elevator-2-jamb-1-north, f1-door-elevator-2-jamb-2-west, f1-door-elevator-2-jamb-2-north

f1-door-elevator-1verified · printed

finished_width_between_inner_jamb_faces

3'-6"

3.5 ft

Local finished entrance field; neither operating clear width nor leaf width. Physical front and wall cut remain withheld.

IMG_1097 · sheet-W217 · Locate on drawing ↗

Drawing notation: Finished entrance and ornamental jamb face-width chains, panel offsets and material labels.

verified-in-dependencies

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: Bay P Elevator 2 plan station, finished entrance segment, and Elevator 1 similar applicability.

verified-in-dependencies

f1-door-elevator-2verified · printed

finished_width_between_inner_jamb_faces

3'-6"

3.5 ft

Local finished entrance field; neither operating clear width nor leaf width. Physical front and wall cut remain withheld.

IMG_1097 · sheet-W217 · Locate on drawing ↗

Drawing notation: Finished entrance and ornamental jamb face-width chains, panel offsets and material labels.

verified-in-dependencies

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: Bay P Elevator 2 plan station, finished entrance segment, and Elevator 1 similar applicability.

verified-in-dependencies

f1-door-elevator-1unreviewed · inferred

exact_physical_front_to_back_depth

Unresolved

Numeric value unresolved

No classified section or plan chain bounds a physical front component's front and back faces. The W217 6-inch jamb widths and adjacent 2-inch witness are not depth measurements. Physical front and wall cut remain withheld.

IMG_1097 · sheet-W217 · Locate on drawing ↗

Drawing notation: Finished entrance and ornamental jamb face-width chains, panel offsets and material labels.

verified-in-dependencies

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: Bay P Elevator 2 plan station, finished entrance segment, and Elevator 1 similar applicability.

verified-in-dependencies

IMG_1126 · sheet-W229 · Locate on drawing ↗

Drawing notation: Elevator 1 south landing face direction and one-axis enclosure/hatch controls.

verified-in-dependencies

IMG_1267 · sheet-W230 · Locate on drawing ↗

Drawing notation: Elevator 2 east enclosure face and one-axis clear-hatch controls.

verified-in-dependencies

f1-door-elevator-2unreviewed · inferred

exact_physical_front_to_back_depth

Unresolved

Numeric value unresolved

No classified section or plan chain bounds a physical front component's front and back faces. The W217 6-inch jamb widths and adjacent 2-inch witness are not depth measurements. Physical front and wall cut remain withheld.

IMG_1097 · sheet-W217 · Locate on drawing ↗

Drawing notation: Finished entrance and ornamental jamb face-width chains, panel offsets and material labels.

verified-in-dependencies

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: Bay P Elevator 2 plan station, finished entrance segment, and Elevator 1 similar applicability.

verified-in-dependencies

IMG_1126 · sheet-W229 · Locate on drawing ↗

Drawing notation: Elevator 1 south landing face direction and one-axis enclosure/hatch controls.

verified-in-dependencies

IMG_1267 · sheet-W230 · Locate on drawing ↗

Drawing notation: Elevator 2 east enclosure face and one-axis clear-hatch controls.

verified-in-dependencies

f1-door-elevator-2unreviewed · derived

zero_thickness_analytical_entrance_center_XYZ.x

W217 Bay P station 21'-4 1/2"

63.454587 ft

2 ft W3 trace uncertainty; not a physical host face or exact construction station. Physical front and wall cut remain withheld.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: Bay P Elevator 2 plan station, finished entrance segment, and Elevator 1 similar applicability.

verified-in-dependencies

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: Elevator 2 Bay P analytical station; 2 ft trace uncertainty.

provisional-trace-in-dependency

f1-door-elevator-2unreviewed · derived

zero_thickness_analytical_entrance_center_XYZ.y

W217 Bay P station 21'-4 1/2"

0 ft

2 ft W3 trace uncertainty; not a physical host face or exact construction station. Physical front and wall cut remain withheld.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: Bay P Elevator 2 plan station, finished entrance segment, and Elevator 1 similar applicability.

verified-in-dependencies

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: Elevator 2 Bay P analytical station; 2 ft trace uncertainty.

provisional-trace-in-dependency

f1-door-elevator-2unreviewed · derived

zero_thickness_analytical_entrance_center_XYZ.z

W217 Bay P station 21'-4 1/2"

50.60494 ft

2 ft W3 trace uncertainty; not a physical host face or exact construction station. Physical front and wall cut remain withheld.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: Bay P Elevator 2 plan station, finished entrance segment, and Elevator 1 similar applicability.

verified-in-dependencies

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: Elevator 2 Bay P analytical station; 2 ft trace uncertainty.

provisional-trace-in-dependency

f1-door-elevator-2unreviewed · inferred

accepted_host_face_and_wall_thickness

Unresolved

Numeric value unresolved

Bay P plan station and W230 east enclosure X datum do not classify a complete physical host face, wall thickness or construction return. Physical front and wall cut remain withheld.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: Bay P Elevator 2 plan station, finished entrance segment, and Elevator 1 similar applicability.

verified-in-dependencies

IMG_1267 · sheet-W230 · Locate on drawing ↗

Drawing notation: Elevator 2 east enclosure face and one-axis clear-hatch controls.

verified-in-dependencies

IMG_1202 · sheet-W3 · Locate on drawing ↗

Drawing notation: Elevator 2 Bay P analytical station; 2 ft trace uncertainty.

provisional-trace-in-dependency

f1-main-foyer-public-lobby-screen-assemblyunreviewed · inferred

face-to-face depth by segment

Unresolved

Numeric value unresolved

unresolved. A composed screen cannot be extruded as one opaque wall.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY U; HALF ELEVATION OF BAY U; BAYS T & V SIMILAR

unresolved; The candidate is a composed transparent screen rather than one continuous opaque wall; no classified front/back face, thickness, segment footprints, finished jamb pairs, threshold elevation, or finished top is accepted in canonical coordinates.

f1-main-foyer-public-lobby-screen-assemblyunreviewed · inferred

finished screen/pier top local Y

Unresolved

Numeric value unresolved

unresolved; neither room ceiling nor next-storey datum assigns screen top. A composed screen cannot be extruded as one opaque wall.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: PLAN OF BAY U; HALF ELEVATION OF BAY U; BAYS T & V SIMILAR

unresolved; neither room ceiling nor next-storey datum assigns screen top; The candidate is a composed transparent screen rather than one continuous opaque wall; no classified front/back face, thickness, segment footprints, finished jamb pairs, threshold elevation, or finished top is accepted in canonical coordinates.

f1-main-foyer-public-lobby-screen-assemblyverified · printed

Bay U elevation pattern applies to T and V as similar types

BAYS T & V SIMILAR

1 count

supported for typological repetition only, not exact per-bay dimensions. Typological similarity and component identity do not authorize physical extrusion or W3 placement.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: BAYS T & V SIMILAR

supported for typological repetition only, not exact per-bay dimensions

f1-main-foyer-public-lobby-screen-assemblyverified · printed

section title names three bays

SECTION THRU BAYS U T & V

3 count

supported for section applicability, not a canonical vertical interval. Typological similarity and component identity do not authorize physical extrusion or W3 placement.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: SECTION THRU BAYS U T & V

supported for section applicability, not a canonical vertical interval

f1-main-foyer-public-lobby-screen-assemblyverified · observed

fixed glazed field above the paired door-head ornament

FIXED ... CLEAR PLATE GLASS; METAL & GLASS

1 count

supported as Bay U construction; precise glazing limits unresolved. Typological similarity and component identity do not authorize physical extrusion or W3 placement.

IMG_1095 · sheet-W217 · Locate on drawing ↗

Drawing notation: FIXED ... CLEAR PLATE GLASS; METAL & GLASS

supported as Bay U construction; precise glazing limits unresolved

View all source photographs →