Gus J. SolomonUnited States Courthouse
← Back to the building1933 reconstruction · research preview

The measured building.

Every dimension belongs to an object and a drawing. Original room numbers, object marks, printed values and source regions stay together—even when the answer is unresolved.

Source photographs
464
Identified objects
5833
Verified printed values
15211
Disputed values
21

464 of 464 photographs have extraction records, containing 31,062 properties. Initial image review is not exhaustive extraction: 0 photographs have passed the full-region check. 66 numbered sheets are reconciled. Modeling and architectural registration are separate work; these counts do not establish a complete building.

Download the structured register (JSON)

Open the coordinated research model →

Clear filters
IMG_1328 · Folder 186

Basement & Foundation Plan

Original sheet identity has not yet been reconciled.

Extraction: Reviewed · extraction partial. Partial: 96 main footing rows, 34 stubs and 17 entrance instances transcribed. Ambiguous schedule cells and unregistered positions are not approved geometry. Four corner controls and six check intersections on each sheet; source orientation; existing 147-point trace set transformed arithmetically. Reuse of previously transcribed C4 footing/cap dimensions and bottom reference only. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 corner repick; scalar E established, signed pad placement still unresolved. C1 corner repick; scalar E established, signed pad placement still unresolved. C1 corner repick; scalar E established, signed pad placement still unresolved. C1 corner repick; scalar E established, signed pad placement still unresolved. C1 corner repick; scalar E established, signed pad placement still unresolved. C1 corner repick; scalar E established, signed pad placement still unresolved. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 pad schedule, one-axis center, signed-offset and elevation gate. C16 steel-column row repick; footing signed Z offset remains unresolved. C16 steel-column row repick; footing signed Z offset remains unresolved. C16 steel-column row repick; footing signed Z offset remains unresolved. C16 steel-column row repick; footing signed Z offset remains unresolved. C16 steel-column row repick; footing signed Z offset remains unresolved. C16 steel-column row repick; footing signed Z offset remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. Partial timed visual review: Prior-package and OCR audit only; no new image inspection or duplicate verified readings. Partial timed visual review: Text/OCR and prior-package audit only; no new image inspection and no duplicate verified measurements. Partial timed visual review: Prior evidence reused; only selected remaining source-local regions reviewed. No historical placement or accepted physical geometry. Partial timed visual review: undefined Partial timed visual review: undefined Partial timed visual review: undefined Partial timed visual review: undefined Partial timed visual review: undefined Partial timed visual review: undefined Partial timed visual review: Zero-image coverage routing. No new visual area or source-reading promotion. Partial timed visual review: undefined

Hide coordinated geometry overlay →
Registration: provisional · 6 independent checks · maximum residual 0.458 ft.

Unresolved extraction work
  • main-1-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-1-rebar-count: First digit is not secure; the diameter reads 7/8 inch.
  • main-4-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-4-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-5-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-5-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-6-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-6-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-7-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-7-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-8-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-8-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-9-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-9-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-10-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-10-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-11-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-11-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-12-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-13-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-13-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-14-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-15-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-16-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-16-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-18-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-19-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-20-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-20-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-21-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-22-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-23-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-24-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-24-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-25-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-25-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-26-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-26-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-27-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-27-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-28-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-30-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-33-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-35-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-36-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-36-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-37-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-37-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-42-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-42-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-43-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-43-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-44-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-45-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-46-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-47-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-48-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-49-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-51-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-52-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-52-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-53-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-53-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-54-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-57-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-58-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-58-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-59-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-59-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-60-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-61-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-62-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-63-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-64-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-65-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-66-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-67-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-68-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-69-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-70-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-70-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-71-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-71-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-72-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-72-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-73-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-73-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-74-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-75-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-76-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-77-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-78-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-79-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-80-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-81-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-82-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-83-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-84-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-84-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-85-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-86-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-86-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-87-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-87-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-88-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-88-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-89-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-89-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-90-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-90-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-91-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-91-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-92-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-92-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-93-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-93-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-94-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-94-rebar: Printed ditto refers to an unresolved reinforcement cell.
  • main-95-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-95-rebar: Two-line transverse/longitudinal bar counts and/or diameters remain illegible.
  • main-96-cap-depth: Whole-foot/inch prefix transcribed; small fractional-inch ending is not reliable in this photograph.
  • main-13-bottom-elevation: Elevation label is too small or overlaps other drafting.
  • main-17-bottom-elevation: Elevation label is too small or overlaps other drafting.
  • main-23-bottom-elevation: Elevation label is too small or overlaps other drafting.
  • stub-S8-bottom-elevation: Elevation label is too small or overlaps other drafting.
  • boiler-room-floor-elevation: Small 2/7 glyph is ambiguous. Cross-sheet evidence supplied by the envelope extraction reads 77.25.
  • oil-tank-foundation-thickness-rebar: Small vertical lettering is not reliable at this photograph's resolution.
  • entrance-row-spacing: 0/1 ending is ambiguous in the available crop.
  • drawing-number: The right portion of the title block is occluded by the photograph edge/wooden strip. A later correspondence report mentions 414/400, but that is not treated as the sheet's visible number.
  • small-plan-auxiliary-dimensions: The bounded crop pass does not exhaust every small measured value in these dense areas. No exhaustive-completion claim is made.
  • main-78-79-handwritten-revisions: Yellow handwriting appears adjacent to both printed depths. Its sign, date and revision authority are not established, so printed depths are retained without silently applying the annotation.
  • corner-offset-review: Current visual reading is 1½″ but the compact fraction needs a sharper source. Do not apply globally.
  • Resolve local residuals with a flatter scan or additional constrained registration before tighter geometric use.
  • Independently recheck each of 147 source symbol centers; this pass visually refines only registration controls and checks.
  • Resolve each footing/cap center from eccentricity and offset evidence before placing foundation solids.
  • Review remaining regions and companion details before claiming complete extraction.
  • C4 plan symbol and eccentricity direction
  • C4 footing detailed section and reinforcement
  • Cap thickness fraction
  • W409 suffix a E magnitude independently read and tied to C1
  • signed footing-center minus C1-column-center X offset
  • signed footing-center minus C1-column-center Z offset
  • independent check of actual C1 pad center and two footprint edges
  • cap/pier center, depth, and bearing transform
  • reinforcement quantity and detailed geometry
  • material/finish confirmation and as-built position
  • signed C1 pad-center minus steel-column-center X offset
  • signed C1 pad-center minus steel-column-center Z offset
  • which axis, if any, receives W409 E at the corner and whether a separate corner-axis offset applies
  • two independently identified and dimensioned C1 pad edges
  • cap/pier transform and bearing continuity
  • reinforcement layout and quantities
  • material and finish confirmation
  • as-built position
  • C16 world Z center and eccentricity
  • Physical world footprint
  • signed footing C.G. minus C16 steel-column center in world Z, including an explicit zero if applicable
  • dimensioned north and south pad edges relative to the C16 centerline or an attributable center-offset detail
  • cap center, orientation, thickness and bearing transform
  • reinforcement count and bar placement
  • independent/as-built check
  • actual-plan attribution of the Broadway footing centerline to C24 pad center of gravity
  • signed C24 pad-center minus steel-column-center X offset
  • signed C24 pad-center minus steel-column-center Z offset, including proof of zero if centered
  • 12-foot versus 14-foot scheduled side assignment to world X/Z from attributable pad edges or printed dimensions
  • cap, base, reinforcement and as-built geometry
  • C13 pad C.G. minus steel center signed X offset, including its side orientation
  • legible C13 footing-bottom elevation
  • cap center, thickness and bearing transform
  • printed C14 steel-column world X station or checked dimensioned tie
  • C14 pad C.G. minus steel center signed X and Z offsets, including proof of zero on either axis
  • applicable eccentricity key or direct pad-center control
  • printed C15 steel-column world X station or checked dimensioned tie
  • C15 pad C.G. minus steel center signed X and Z offsets, including proof of zero on either axis
  • Remaining member, reinforcement and connection dimensions require fine-region review
  • Revision marks and historical instance placements remain unreconciled
  • Companion-sheet registration and modeling checks remain outstanding
  • Complete fine-fraction/member schedule transcription
  • Historical instance mapping and endpoint registration
  • Annotated revisions and companion notes reconciliation
  • Accepted connections and modeling checks
  • Complete member/plate/bar fraction transcription
  • Historical instance and source-to-plan registration
  • Revision authority and companion applicability
  • Connection and modeling acceptance checks
  • Historical issue, revision authority and actual installation remain unresolved.
  • Accepted architectural registration, host faces, physical routes and installed quantities remain unresolved.
  • Materials, finishes, fixture type mappings, physical dimensions and mounting heights remain unknown.
  • Unvisited sheet regions, notes, schedules, callouts and companion details require review; extraction partial and modeling/checking unchecked.
  • All other notes, regions, schedules and companion details remain partially reviewed; this package grants no architectural acceptance.
  • Old failed fractions, unsupported units, broad placement gates and previously resolved questions were not re-viewed or promoted.
  • Boiler-room slab candidate remains unreviewed; no confirmation or datum selection.
  • Installed instance locations, source-to-plan registration, governing original/revision applicability and as-built correspondence remain unresolved.
  • Material grades, finishes, full dimensional envelopes, capacities and independent model checks remain unresolved.
  • Other regions, notes, schedules and companion details require review; this is partial extraction and grants no geometry approval.
  • Rows87 and95 have unequal transverse/longitudinal counts. Their historical countEachWay nulls remain open because the field cannot represent unequal directional counts.
  • Bar diameter fractions/units and cap thickness fractions remain unresolved; no pile/cap topology, signed C.G. placement or world coordinates inferred.
  • Complete source-to-instance registration, physical endpoints, installed quantities and revision authority remain unresolved.
  • Unreviewed regions, companion sheets, schedules and fine fractions remain open; this package is not exhaustive coverage.
  • Material grades, connection capacities, world transforms and independent model/as-built checks remain unestablished.
  • Typical-detail exceptions and dimension-witness line are source-local only; no footing C.G. world location established.
  • One crop intended for trenches actually showed schedule rows1–28; counted as a wrong-target attempt, no new reinforcement or cap-fraction reading adopted. No piles or lateral system inferred.
  • Complete source-to-instance and endpoint registration remains unresolved.
  • Material grades, finishes, connection capacities and as-built checks remain unestablished.
  • Unreviewed regions, fine fractions, schedules, companion applicability and revision authority remain open.
  • Bounded rows 87 and 95 reinspection did not independently resolve cap-thickness fractions or reinforcement diameter fraction/units; prior directional counts reused.
  • No countEachWay closure because transverse and longitudinal quantities differ; no pile/cap topology or world placement inferred.
  • Full source-to-instance assignment, physical endpoints, installed quantities and governing revision remain unresolved.
  • Unreviewed regions, notes, fine fractions and companion sheets remain open; this package is not exhaustive coverage.
  • No world geometry, material grade, structural capacity or model acceptance established.
  • Installed instances, physical endpoints, source-to-plan registration and governing original/revision applicability remain unresolved.
  • Complete member dimensions, reinforcement profiles, material grades, connection capacities and as-built/model checks remain outstanding.
  • Retain every routing entry and prior inventory missing property. Pending selector excludes already closed questions but is not exhaustive region coverage.
  • Original/revision authority, companion applicability, source-to-instance mapping, physical endpoints, material/finish, independent model/as-built check remain separate.
  • No whole-source completion, accepted geometry or irrecoverable-gap claim.

Download OCR observations (unverified)

Loading the selected drawing…

Scroll or pinch to inspect this drawing. Blue: printed controls. Gold: provisional geometry. Pink: held-out check residuals. An overlay is a comparison, not certification. Archival drawing photograph · Oregon Historical Society research collections.

Open source image separately ↗

2049 matching properties

Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.

column-92unreviewed · traced

world x foundation trace

20.843495843316678 ft (provisional trace)

20.843496 ft · estimated uncertainty ±1.941443436 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-92unreviewed · traced

world z foundation trace

78.38362966927016 ft (provisional trace)

78.38363 ft · estimated uncertainty ±1.941443436 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-93unreviewed · traced

world x foundation trace

33.66125041544774 ft (provisional trace)

33.66125 ft · estimated uncertainty ±1.947056245 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-93unreviewed · traced

world z foundation trace

78.79247935595401 ft (provisional trace)

78.792479 ft · estimated uncertainty ±1.947056245 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-94unreviewed · traced

world x foundation trace

48.298416492560506 ft (provisional trace)

48.298416 ft · estimated uncertainty ±1.966322935 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-94unreviewed · traced

world z foundation trace

78.66907868956447 ft (provisional trace)

78.669079 ft · estimated uncertainty ±1.966322935 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-95unreviewed · traced

world x foundation trace

62.72916396075794 ft (provisional trace)

62.729164 ft · estimated uncertainty ±1.984892701 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-95unreviewed · traced

world z foundation trace

78.8279937276338 ft (provisional trace)

78.827994 ft · estimated uncertainty ±1.984892701 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-96unreviewed · traced

world x foundation trace

78.12234726002809 ft (provisional trace)

78.122347 ft · estimated uncertainty ±2.00559665 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-96unreviewed · traced

world z foundation trace

78.64457541821582 ft (provisional trace)

78.644575 ft · estimated uncertainty ±2.00559665 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S1unreviewed · traced

world x foundation trace

-62.54301489117622 ft (provisional trace)

-62.543015 ft · estimated uncertainty ±2.166574977 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S1unreviewed · traced

world z foundation trace

-41.908025564937866 ft (provisional trace)

-41.908026 ft · estimated uncertainty ±2.166574977 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S2unreviewed · traced

world x foundation trace

-48.62641090831714 ft (provisional trace)

-48.626411 ft · estimated uncertainty ±2.165389066 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S2unreviewed · traced

world z foundation trace

-41.92547185596695 ft (provisional trace)

-41.925472 ft · estimated uncertainty ±2.165389066 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S3unreviewed · traced

world x foundation trace

-34.0043247505113 ft (provisional trace)

-34.004325 ft · estimated uncertainty ±2.206112613 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S3unreviewed · traced

world z foundation trace

-64.31261871492399 ft (provisional trace)

-64.312619 ft · estimated uncertainty ±2.206112613 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S4unreviewed · traced

world x foundation trace

-21.028253122647307 ft (provisional trace)

-21.028253 ft · estimated uncertainty ±2.205021733 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S4unreviewed · traced

world z foundation trace

-64.39605185406116 ft (provisional trace)

-64.396052 ft · estimated uncertainty ±2.205021733 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S5unreviewed · traced

world x foundation trace

-6.977358154503575 ft (provisional trace)

-6.977358 ft · estimated uncertainty ±2.203293651 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S5unreviewed · traced

world z foundation trace

-64.20889921434387 ft (provisional trace)

-64.208899 ft · estimated uncertainty ±2.203293651 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S6unreviewed · traced

world x foundation trace

7.159600616877722 ft (provisional trace)

7.159601 ft · estimated uncertainty ±2.222326283 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S6unreviewed · traced

world z foundation trace

-64.29889445979411 ft (provisional trace)

-64.298894 ft · estimated uncertainty ±2.222326283 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S7unreviewed · traced

world x foundation trace

21.37942116770348 ft (provisional trace)

21.379421 ft · estimated uncertainty ±2.240654171 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S7unreviewed · traced

world z foundation trace

-63.83119757213081 ft (provisional trace)

-63.831198 ft · estimated uncertainty ±2.240654171 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S8unreviewed · traced

world x foundation trace

34.68395629785347 ft (provisional trace)

34.683956 ft · estimated uncertainty ±2.259358986 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S8unreviewed · traced

world z foundation trace

-64.00747977558315 ft (provisional trace)

-64.00748 ft · estimated uncertainty ±2.259358986 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S9unreviewed · traced

world x foundation trace

-62.49163017190414 ft (provisional trace)

-62.49163 ft · estimated uncertainty ±2.11509687 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S9unreviewed · traced

world z foundation trace

-14.286966966619158 ft (provisional trace)

-14.286967 ft · estimated uncertainty ±2.11509687 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S10unreviewed · traced

world x foundation trace

-48.52185860798997 ft (provisional trace)

-48.521859 ft · estimated uncertainty ±2.113826709 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S10unreviewed · traced

world z foundation trace

-14.214599353258924 ft (provisional trace)

-14.214599 ft · estimated uncertainty ±2.113826709 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S11unreviewed · traced

world x foundation trace

48.449756447519476 ft (provisional trace)

48.449756 ft · estimated uncertainty ±2.16424879 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S11unreviewed · traced

world z foundation trace

-13.712257256027996 ft (provisional trace)

-13.712257 ft · estimated uncertainty ±2.16424879 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S12unreviewed · traced

world x foundation trace

62.43315275099722 ft (provisional trace)

62.433153 ft · estimated uncertainty ±2.183978658 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S12unreviewed · traced

world z foundation trace

-13.984516962733148 ft (provisional trace)

-13.984517 ft · estimated uncertainty ±2.183978658 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S13unreviewed · traced

world x foundation trace

-62.41231964554141 ft (provisional trace)

-62.41232 ft · estimated uncertainty ±2.063250732 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S13unreviewed · traced

world z foundation trace

13.867902487709273 ft (provisional trace)

13.867902 ft · estimated uncertainty ±2.063250732 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S14unreviewed · traced

world x foundation trace

-48.41168309595757 ft (provisional trace)

-48.411683 ft · estimated uncertainty ±2.06175697 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S14unreviewed · traced

world z foundation trace

14.112053437762842 ft (provisional trace)

14.112053 ft · estimated uncertainty ±2.06175697 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S15unreviewed · traced

world x foundation trace

48.3219919122332 ft (provisional trace)

48.321992 ft · estimated uncertainty ±2.102384041 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

column-S15unreviewed · traced

world z foundation trace

14.351094090713296 ft (provisional trace)

14.351094 ft · estimated uncertainty ±2.102384041 ft

Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.

View all source photographs →