Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
foundation-sixth-street-exterior-column-chainverified · printed
Column chain · bay-5
168 in168 in
IMG_1328 · Locate on drawing ↗Drawing notation: 157′2″ overall; 22′7″; 8 @ 14′0″ = 112′0″; 22′7″
Extraction confidence: medium-high. Eight equal intervals are explicitly printed. End-bay 22′7″ interpretation closes the total. The sheet does not use an alphanumeric grid.
foundation-sixth-street-exterior-column-chainverified · printed
Column chain · bay-6
168 in168 in
IMG_1328 · Locate on drawing ↗Drawing notation: 157′2″ overall; 22′7″; 8 @ 14′0″ = 112′0″; 22′7″
Extraction confidence: medium-high. Eight equal intervals are explicitly printed. End-bay 22′7″ interpretation closes the total. The sheet does not use an alphanumeric grid.
foundation-sixth-street-exterior-column-chainverified · printed
Column chain · bay-7
168 in168 in
IMG_1328 · Locate on drawing ↗Drawing notation: 157′2″ overall; 22′7″; 8 @ 14′0″ = 112′0″; 22′7″
Extraction confidence: medium-high. Eight equal intervals are explicitly printed. End-bay 22′7″ interpretation closes the total. The sheet does not use an alphanumeric grid.
foundation-sixth-street-exterior-column-chainverified · printed
Column chain · bay-8
168 in168 in
IMG_1328 · Locate on drawing ↗Drawing notation: 157′2″ overall; 22′7″; 8 @ 14′0″ = 112′0″; 22′7″
Extraction confidence: medium-high. Eight equal intervals are explicitly printed. End-bay 22′7″ interpretation closes the total. The sheet does not use an alphanumeric grid.
foundation-sixth-street-exterior-column-chainverified · printed
Column chain · bay-9
168 in168 in
IMG_1328 · Locate on drawing ↗Drawing notation: 157′2″ overall; 22′7″; 8 @ 14′0″ = 112′0″; 22′7″
Extraction confidence: medium-high. Eight equal intervals are explicitly printed. End-bay 22′7″ interpretation closes the total. The sheet does not use an alphanumeric grid.
foundation-sixth-street-exterior-column-chainverified · printed
Column chain · bay-10
271 in271 in
IMG_1328 · Locate on drawing ↗Drawing notation: 157′2″ overall; 22′7″; 8 @ 14′0″ = 112′0″; 22′7″
Extraction confidence: medium-high. Eight equal intervals are explicitly printed. End-bay 22′7″ interpretation closes the total. The sheet does not use an alphanumeric grid.
foundation-sixth-street-exterior-column-chainverified · printed
Column chain · printed-overall
1886 in1886 in
IMG_1328 · Locate on drawing ↗Drawing notation: 157′2″ overall; 22′7″; 8 @ 14′0″ = 112′0″; 22′7″
Extraction confidence: medium-high. Eight equal intervals are explicitly printed. End-bay 22′7″ interpretation closes the total. The sheet does not use an alphanumeric grid.
foundation-interior-cross-bay-chainverified · printed
Column chain · bay-1
144 in144 in
IMG_1328 · Locate on drawing ↗Drawing notation: 12′0″ + 12′0″ + 20′0″ + 12′0″ + 12′0″
Extraction confidence: high. This explicitly differs from several exterior bay spacings. Do not create a uniform structural lattice.
foundation-interior-cross-bay-chainverified · printed
Column chain · bay-2
144 in144 in
IMG_1328 · Locate on drawing ↗Drawing notation: 12′0″ + 12′0″ + 20′0″ + 12′0″ + 12′0″
Extraction confidence: high. This explicitly differs from several exterior bay spacings. Do not create a uniform structural lattice.
foundation-interior-cross-bay-chainverified · printed
Column chain · bay-3
240 in240 in
IMG_1328 · Locate on drawing ↗Drawing notation: 12′0″ + 12′0″ + 20′0″ + 12′0″ + 12′0″
Extraction confidence: high. This explicitly differs from several exterior bay spacings. Do not create a uniform structural lattice.
foundation-interior-cross-bay-chainverified · printed
Column chain · bay-4
144 in144 in
IMG_1328 · Locate on drawing ↗Drawing notation: 12′0″ + 12′0″ + 20′0″ + 12′0″ + 12′0″
Extraction confidence: high. This explicitly differs from several exterior bay spacings. Do not create a uniform structural lattice.
foundation-interior-cross-bay-chainverified · printed
Column chain · bay-5
144 in144 in
IMG_1328 · Locate on drawing ↗Drawing notation: 12′0″ + 12′0″ + 20′0″ + 12′0″ + 12′0″
Extraction confidence: high. This explicitly differs from several exterior bay spacings. Do not create a uniform structural lattice.
foundation-entrance-front-column-chainverified · printed
Column chain · bay-1
120 in120 in
IMG_1328 · Locate on drawing ↗Drawing notation: 10′0″ repeated in six bays
Extraction confidence: high. Printed chain follows the entrance front; image-traced points are skewed by the photograph and drawn angled front.
foundation-entrance-front-column-chainverified · printed
Column chain · bay-2
120 in120 in
IMG_1328 · Locate on drawing ↗Drawing notation: 10′0″ repeated in six bays
Extraction confidence: high. Printed chain follows the entrance front; image-traced points are skewed by the photograph and drawn angled front.
foundation-entrance-front-column-chainverified · printed
Column chain · bay-3
120 in120 in
IMG_1328 · Locate on drawing ↗Drawing notation: 10′0″ repeated in six bays
Extraction confidence: high. Printed chain follows the entrance front; image-traced points are skewed by the photograph and drawn angled front.
foundation-entrance-front-column-chainverified · printed
Column chain · bay-4
120 in120 in
IMG_1328 · Locate on drawing ↗Drawing notation: 10′0″ repeated in six bays
Extraction confidence: high. Printed chain follows the entrance front; image-traced points are skewed by the photograph and drawn angled front.
foundation-entrance-front-column-chainverified · printed
Column chain · bay-5
120 in120 in
IMG_1328 · Locate on drawing ↗Drawing notation: 10′0″ repeated in six bays
Extraction confidence: high. Printed chain follows the entrance front; image-traced points are skewed by the photograph and drawn angled front.
foundation-entrance-front-column-chainverified · printed
Column chain · bay-6
120 in120 in
IMG_1328 · Locate on drawing ↗Drawing notation: 10′0″ repeated in six bays
Extraction confidence: high. Printed chain follows the entrance front; image-traced points are skewed by the photograph and drawn angled front.
column-1unreviewed · traced
world x foundation trace
-78.9018748421338 ft (provisional trace)-78.901875 ft · estimated uncertainty ±2.237222407 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-1unreviewed · traced
world z foundation trace
-78.48692792566763 ft (provisional trace)-78.486928 ft · estimated uncertainty ±2.237222407 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-2unreviewed · traced
world x foundation trace
-63.60472422932912 ft (provisional trace)-63.604724 ft · estimated uncertainty ±2.236791428 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-2unreviewed · traced
world z foundation trace
-79.01153363193592 ft (provisional trace)-79.011534 ft · estimated uncertainty ±2.236791428 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-3unreviewed · traced
world x foundation trace
-49.57242790650528 ft (provisional trace)-49.572428 ft · estimated uncertainty ±2.235714889 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-3unreviewed · traced
world z foundation trace
-79.1504378727106 ft (provisional trace)-79.150438 ft · estimated uncertainty ±2.235714889 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-4unreviewed · traced
world x foundation trace
-34.21589875243004 ft (provisional trace)-34.215899 ft · estimated uncertainty ±2.23522313 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-4unreviewed · traced
world z foundation trace
-79.6797695923407 ft (provisional trace)-79.67977 ft · estimated uncertainty ±2.23522313 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-5unreviewed · traced
world x foundation trace
-20.982265400891453 ft (provisional trace)-20.982265 ft · estimated uncertainty ±2.233619659 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-5unreviewed · traced
world z foundation trace
-79.52804507548066 ft (provisional trace)-79.528045 ft · estimated uncertainty ±2.233619659 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-6unreviewed · traced
world x foundation trace
-6.7516069247124175 ft (provisional trace)-6.751607 ft · estimated uncertainty ±2.238653093 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-6unreviewed · traced
world z foundation trace
-79.57431672268542 ft (provisional trace)-79.574317 ft · estimated uncertainty ±2.238653093 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-7unreviewed · traced
world x foundation trace
7.063454957576899 ft (provisional trace)7.063455 ft · estimated uncertainty ±2.257561051 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-7unreviewed · traced
world z foundation trace
-79.61587743391043 ft (provisional trace)-79.615877 ft · estimated uncertainty ±2.257561051 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-8unreviewed · traced
world x foundation trace
21.13287881640511 ft (provisional trace)21.132879 ft · estimated uncertainty ±2.276756333 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-8unreviewed · traced
world z foundation trace
-79.56388725718455 ft (provisional trace)-79.563887 ft · estimated uncertainty ±2.276756333 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-9unreviewed · traced
world x foundation trace
33.49512689954361 ft (provisional trace)33.495127 ft · estimated uncertainty ±2.293920167 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-9unreviewed · traced
world z foundation trace
-79.58972632871816 ft (provisional trace)-79.589726 ft · estimated uncertainty ±2.293920167 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-10unreviewed · traced
world x foundation trace
48.58887461033107 ft (provisional trace)48.588875 ft · estimated uncertainty ±2.314865064 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-10unreviewed · traced
world z foundation trace
-79.54575905882393 ft (provisional trace)-79.545759 ft · estimated uncertainty ±2.314865064 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-11unreviewed · traced
world x foundation trace
62.650702074366585 ft (provisional trace)62.650702 ft · estimated uncertainty ±2.334279618 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.
column-11unreviewed · traced
world z foundation trace
-79.39421740727583 ft (provisional trace)-79.394217 ft · estimated uncertainty ±2.334279618 ft
Candidate support-center location; the prior trace may represent a steel column, concrete pilaster, stub, or entrance support. Member material/type requires the original schedule.