basePlate.B
B 3636 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 36
Every dimension belongs to an object and a drawing. Original room numbers, object marks, printed values and source regions stay together—even when the answer is unresolved.
464 of 464 photographs have extraction records, containing 27,517 properties. Initial image review is not exhaustive extraction: 0 photographs have passed the full-region check. 66 numbered sheets are reconciled. Modeling and architectural registration are separate work; these counts do not establish a complete building.
Download the structured register (JSON)Sheet W409
Extraction: Reviewed · extraction partial. Partial: floor controls and first-floor perimeter frame; not a complete member or connection schedule. Partial W409 extraction: numbered column identities and separate base-plate properties. Group headers do not establish full-height steel continuity. Exterior schedule body only: all 22 printed groups / 42 column marks; four section rows per group plus two TRUSS interruptions. Reuses existing verified frame-third-to-fourth interval; no new visual inspection. Targeted review of the W409 FLOOR HEIGHTS column, including every printed basement-through-roof interval and the printed roof high-point elevation. The adjacent 96-column section schedule remains covered by column-schedule.json and is not re-transcribed here. C4 schedule, bounded base-plate/offset key, general cover/milling note and typical splice references only. C24 pad schedule and placement gate; no accepted world pad box. C24 pad schedule and placement gate; no accepted world pad box. C1 scheduled size and column control; signed pad-center offset unproved. C1 scheduled size and column control; signed pad-center offset unproved. C1 corner repick; scalar E established, signed pad placement still unresolved. C1 corner repick; scalar E established, signed pad placement still unresolved. C1 corner repick; scalar E established, signed pad placement still unresolved. W-6 Room 402 corridor-wall pilot; only thickness and selected datums have printed numeric support. W-6 Room 402 corridor-wall pilot; only thickness and selected datums have printed numeric support. Broadway C58–C52 fourth-floor shell physical-bounds gate; control frame only. Broadway C58–C52 fourth-floor shell physical-bounds gate; control frame only. Broadway C58–C52 fourth-floor shell physical-bounds gate; control frame only. C24 pad centerline/side-orientation gate; signed X/Z placement remains unresolved. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. C13–C15 pad schedule and placement gate; finite world pads withheld. Partial timed visual review: Prior-package and OCR audit only; no new image inspection or duplicate verified readings. Partial timed visual review: Text/OCR and prior-package audit only; no new image inspection and no duplicate verified measurements. Partial timed visual review: Prior evidence reused; only selected remaining source-local regions reviewed. No historical placement or accepted physical geometry. Partial timed visual review: undefined Partial timed visual review: undefined Partial timed visual review: undefined
Loading the selected drawing…
Scroll or pinch to inspect this drawing. Archival drawing photograph · Oregon Historical Society research collections.
Open source image separately ↗Printed values, calculations, image traces and observed counts are different kinds of evidence. “Verified” applies to the specific reading—not to the whole room or model.
36 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 36
39 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 39
3.75 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 3¾
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 5′6″
38 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 38
40 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 40
4 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 4
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 5′6″
36 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 36
38 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 38
3.75 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 3¾
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 7′6″
40 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 40
43 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 43
4.25 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 4¼
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 12′0″
37 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 37
40 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 40
4 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 4
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 10′4″
37 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 37
40 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 40
4 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 4
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 12′0″
28 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 28
36 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 36
3.75 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 3¾
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 7′0″
37 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 37
40 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 40
4 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 4
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 8′6″
40 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 40
41 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 41
4 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 4
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 10′6″
40 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: B 40
43 in
Shared printed schedule cell. Exact storey applicability and physical endpoints remain unresolved.
Drawing notation: L 43
4.25 in
Thickness fraction deserves renewed high-resolution verification before fabrication or geometry.
Drawing notation: T 4¼
The distance arrow is printed; sign, baseline, and assignment to each grouped mark require a targeted recheck. This is not an absolute foot elevation.
Drawing notation: 12′0″