IMG_1118 · Folder 191Details of Stair E — Upper Stories
Sheet W226
Extraction: Reviewed · extraction partial. Text-first review followed by one complete source photograph and sequential crops from the same photograph. Reviewed the sheet identity, Section A-A, eighth-, seventh-, typical second-through-sixth-, first- and basement-floor plans, printed riser counts, regional floor elevations, the printed second-floor-only dotted-line exception, and major material/finish callouts. Companion/close-up photographs IMG_1119 and IMG_1120 were identified but not opened. Reused the verified W226 Stair E upper-story extraction and one targeted typical-plan crop to test the printed run, ten-riser-per-flight numbering, second-floor-only dotted-line exception and regional sixth/seventh/eighth-floor datums against registered plan envelopes. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Stair E fourth-to-fifth physical flight/landing/shaft gate; no solid authorized. Partial timed visual review: OCR, queue and existing extraction packages searched first. One sequential upright WebP inspection; only additive selected properties recorded. Previously verified readings reused without duplication. No complete extraction or accepted geometry. Partial timed visual review: Text/OCR, review-queue and prior-package audit; prior verified readings reused without duplication. No accepted geometry or building connections. Partial timed visual review: Text reuse only: prior verified evidence retained without duplication; no new visual review or completeness claim. Partial timed visual review: Selected construction and reference-face review only; source evidence does not authorize physical geometry. Partial timed visual review: undefined Partial timed visual review: Text reuse only. Accepted W226-to-building transform requires checked non-collinear registration and held-out residuals; glyph inspection cannot close it. UP20/DOWN22 and regional datum conflicts remain open. Partial timed visual review: Text-only canonical/queue/OCR reuse; no new image inspection. Partial timed visual review: undefined Partial timed visual review: undefined
Highlighted reading: 7′10½″. verified source-local; precise extension witness not classified; reused evidence: reused stair-e-w226-upper-stories-first.json and stair-e-upper-diagnostic-placement.json; no image reopened
Show every recorded property on this drawing →
Unresolved extraction work
- Accepted W226-to-building X/Z transform
- Resolution of the 20-up versus 22-down printed count between the sixth and seventh floors
- Reconciliation of the W226 seventh-floor elevation 173.25 with the 171.75 exterior and 173.75 schedule/Madison controls
- Exhaustive transcription of every small dimension and note
- Exact rough and finish wall faces
- Flight widths, complete run dimensions, nosings and stringer construction
- Exact landing polygons, slab openings and headroom
- Railing member profiles, connections and terminations
- Plan-condition variations called out for the passage and selected floors
- Independent overlay and residual checks against the floor plans
- Accepted W226-to-building transform
- Exact wall and opening faces
- Exact landing polygons
- Sixth-to-seventh two-riser landing applicability
- Physical tread, riser, stringer, rail and soffit construction
- On W226 close-up IMG_1119 or IMG_1120, transcribe the full typical-plan dimension chain and classify flight, landing, rough-wall and finish-wall endpoints. On registered W6/IMG_1212 and W7/IMG_1213, repick the same physical edge classes and closed floor-opening contours at Stair E; solve the W226 plan-to-canonical transform from non-collinear correspondences and check held-out edges and the adjacent-floor join before authoring one fourth-to-fifth-floor segment.
- Complete fine dimension chains and classified rough/finish endpoints
- Member profiles, fasteners, fabrication details and material-code reconciliation
- Historical instance and floor-plan registration
- Companion details, revision authority and independent physical connection checks
- W226 20-up / 22-down and 173.25 /171.75 /173.75 datum conflicts remain unresolved.
- Complete fine dimension chains and endpoint classification
- W228 construction and material-code reconciliation
- Exact rail/gate profiles, fasteners and opening geometry
- Independent modeling and connection checks
- Source-to-building registration, landing polygons, slab openings and installed instances
- Companion detail/revision authority and independent physical checks
- Accepted rail-to-rail clear width, closed landing/slab-opening boundaries and headroom
- Complete material/gauge/fastener schedules, cap/moulding profiles and finish extents; remaining notes and revisions not fully reviewed
- Checked source-to-building transforms, storey/installed instance applicability and independent physical checks
- W226 UP20/DOWN22 and datum conflicts remain separate; accepted building transform needs checked corresponding controls.
- Complete fine profiles, member sizes, fasteners, finish extents and endpoint classes remain partial.
- Installed quantities, stair/storey/room assignment, closed openings, headroom, source-to-building registration and independent physical checks remain unresolved.
- Governing original/revision and companion applicability remain unresolved; source reading does not approve geometry.
- Text reuse only. Accepted W226-to-building transform requires checked non-collinear registration and held-out residuals; glyph inspection cannot close it. UP20/DOWN22 and regional datum conflicts remain open.
- Complete fine dimension chains, rail/string/nosing profiles, fastener/gauge/material schedules and exact finish/rough endpoint classes remain partial.
- Installed instance/storey assignment, source-to-building registration, closed slab openings, headroom and independent physical checks remain outstanding.
- Companion W228 details and governing revision/installation applicability remain unresolved; source extraction does not approve model geometry.
- Complete cap/moulding/handrail/string/nosing profiles, materials, gauges, fastener sizes and exact endpoint classes remain partial.
- Printed type/floor applicability does not establish installed quantities, storey assignment, source-to-building transforms or accepted physical geometry.
- Full region, companion exposure, revision authority and independent installation/profile/height registration remain outstanding; no irrecoverable gap is asserted.
- W226 UP20/DOWN22 and regional173.25/171.75/173.75 conflicts remain separate and unresolved.
- Remaining cap/moulding/handrail/string/nosing fractions, gauges, fastener material/size/anchorage, finish extents and source endpoint classes.
- Installed storey/room quantities, closed openings and landing boundaries, rail clear width, headroom, source-to-building transforms and independent physical checks.
- Companion/revision authority remains open; no source or floor completeness or irrecoverable gap asserted.
- Complete member/profile dimensions, material/gauge/fastener schedules and exact endpoint classes
- Installed stair/storey/room allocation, quantities, original/revision authority and companion applicability
- Source-to-building registration, complete landing/shaft openings, independent physical checks and architectural acceptance
Download OCR observations (unverified)