IMG_0997 · Folder 193Court 61Z
Original sheet identity has not yet been reconciled.
Extraction: Reviewed · extraction partial. Partial timed visual review: Partial first-pass visual review of public/archive/drawings/complete-upright/IMG_0997.webp after catalogue and OCR. Coordinates are normalized access-image coordinates before any rotation. Actual access image requires 0 degrees rotation to read. Selected evidence only; no geometry/modeling inference. Cropped companion sheets visible behind foreground drawing are excluded. Partial timed visual review: undefined Partial timed visual review: Source-local depicted assembly or specification only. No installed quantities, accepted floor geometry or model placement inferred. Partial timed visual review: undefined
Highlighted reading: [four large upper panel fields drawn]. Observed four large upper rectangular fields across the surviving west-wall elevation. A source view count only; not installed panel inventory or Court602 duplication.
Show every recorded property on this drawing →
Unresolved extraction work
- Complete small-dimension and callout transcription
- Review handwritten revisions and faint annotations
- Identify all instances and companion detail relationships
- Register detail geometry against building locations
- Installed instances, quantities and source-to-building registration remain unestablished.
- Complete dimensions, machining profiles, companion sheets and governing revision authority remain open.
- Actual companion sheets33/34, their subjects and installation/revision authority remain open.
- Remaining fine dimensions and handwritten revisions require targeted higher-resolution evidence
- Companion registration and physical instance mapping remain unresolved
- Sheet33 subject unstated; locate actual companion33/34 before modeling
- Earlier33-pilaster/34-panels readings preserved as audit history
- Exact heights/profile depths and full chain endpoint classes
- Finish notes, capital/shaft details and clipped far left section
- Full plan chains/station correspondence; marble/plaster build-ups
- Correction authority; red approval date does not establish as-built condition
- Whole-image extraction remains partial; uninspected or illegible fine notes/profiles are not certified closed
- No model, renderer or architectural acceptance changed
Download OCR observations (unverified)