IMG_0958 · Folder 194White-pine directory/bulletin-board construction and location schedule; corrected final dimensions unresolved
Sheet number unresolved
Extraction: Reviewed · extraction partial. White-pine directory/bulletin-board construction and location schedule; corrected final dimensions unresolved. Normalized from an existing text re-audit; this import did not reopen the source image. Partial timed visual review: Additive remaining-region review 2026-10-11; prior packages, queue and OCR read before sequential derivative inspection. Regions in native derivative coordinates. Ten inspections including one notes crop across this batch. Partial extraction only; no model changes. Partial timed visual review: Source-local construction detail only; installed instance registration and complete geometry unresolved. Partial timed visual review: Source-local printed construction property; no room geometry, installed quantity or accepted model inference. Partial timed visual review: Bounded follow-up on selected source witnesses only. Partial timed visual review: Structured partial first-pass repair of legacy coverage-only gap. Read existing reports/OCR before one <=1000px JPEG65 locator. No complete extraction/geometry claim. Source region is normalized access image; actual rotation0. Prior audit supplied sheet identity where recorded.
Highlighted reading: [orange and yellow size/quantity corrections across schedule]. Tentative or unresolved locator; numeric value withheld.
Show every recorded property on this drawing →
Unresolved extraction work
- Complete drawing-note transcription
- Every dimension and bay placement
- Detailed hardware/fastener schedule
- Exact cross-sheet bay correspondence
- Cross-photo physical deduplication
- Complete surviving-object inventory
- Exact dimensions
- Construction/alteration chronology
- Condition assessment
- P-6 component extraction
- Installed fixture schedule and positions
- As-built correspondence
- Fixture finish and glass color
- Orange/yellow revised schedule fractions and authority
- All physical board instance placements
- Remaining fine dimensions
- Whole-image regional completeness not established.
- Remaining dimension chains and witness endpoints
- Colored revision authority and precise fractions
- Installed instance and companion-sheet registration
- Whole-image regional completeness not established
- Full dimension chains and witness endpoint reconciliation
- Companion registration and installed instance assignment
- Colored revision authority and remaining regional review
- Modeling and whole-building acceptance checks outstanding
- All red/yellow schedule replacements, exact unit marks/conventions, installation authority and board placements remain open.
- Full directory/bulletin schedule dimensions and quantities question remains open; selected rows never close that aggregate question.
- All other regions, dimensions, endpoint assignments, notes, schedules, callouts and companion details still require systematic review.
- Source-to-room/object placement, original/revision authority and physical installation remain unresolved; modeling and whole-building checks outstanding.
- all remaining notes, dimensions and schedules
- full-sheet completeness
- original/annotation reconciliation and physical instance mapping
Download OCR observations (unverified)